Saturday, August 8, 2026
Relativity Space installs first Aeon R engines on Terran R
Relativity Space has begun installing the first Aeon R engines onto Terran R's first-stage thrust structure, which is built to hold 13 of the 3D-printed, LOX-methane engines for a combined liftoff thrust of about 3.5 million lbf. Every engine completed acceptance testing before installation; once the fully assembled thrust structure is mated to the rest of Stage 1 at Relativity's Long Beach facility, the integrated booster will ship to NASA's Stennis Space Center for hot-fire testing ahead of Terran R's targeted debut later this year.
/ Sources
/ Related
- Relativity Space to expand Terran R production on Space CoastWednesday, July 29, 2026
- Space Force adds Relativity Space to national-security launch poolFriday, July 10, 2026
- Relativity ships first Terran R second stage to StennisSaturday, June 27, 2026
- NASA taps Relativity Space to privately develop a Mars orbiterThursday, June 18, 2026
