Monday, August 3, 2026
Kairos Power validates first molten-salt reactor fuel code
Kairos Power completed verification and validation of KP-BISON, the first fuel performance code built for a molten-salt reactor, on July 16, 2026. The code models how TRISO fuel particles behave and hold structural integrity at the high temperatures inside Kairos's fluoride salt-cooled reactor design, and the company plans to submit the reports to the NRC as part of the licensing basis for its Hermes 2 demonstration plant.
/ Sources
/ About this story
Compiled by Venture Atlas from the sources above, using automated AI-assisted research. This is a summary of reporting published elsewhere, not original reporting - follow the source links for the full account. See our editorial standards.
Something wrong here? Email flightatlas.contact@gmail.com and we will fix it.
