Thursday, September 17, 2026
Boeing flags slower 737 MAX ramp and 777X test slip
Boeing CEO Kelly Ortberg told Morgan Stanley's Laguna conference on September 16 that stabilizing 737 MAX output at 47 jets a month is taking longer than expected, and that the company will only push toward 52 a month once that rate holds. He said the 737-10, which makes up about 30% of all 737 orders, will be certified very soon, and played down analyst expectations of a large Chinese order when President Trump meets President Xi in Washington next week. Boeing separately said some 777X flight testing will spill into 2027 because FAA clearance to begin extended-range twin-engine operations testing is on hold pending certification of a mid-seal on the GE9X engine, though it still targets first delivery next year; the shares closed down 4.5%.
/ Sources
/ About this story
Compiled by Venture Atlas from the sources above, using automated AI-assisted research. This is a summary of reporting published elsewhere, not original reporting - follow the source links for the full account. See our editorial standards.
Something wrong here? Email flightatlas.contact@gmail.com and we will fix it.
/ Related
- Korean Air finalizes record 103-jet Boeing orderWednesday, September 16, 2026
- Navy awards Boeing first MQ-25 production contractTuesday, September 15, 2026
- TAROM takes delivery of first Boeing 737 MAXSunday, September 13, 2026
- Boeing and SPEEA reach a tentative four-year contractSaturday, September 12, 2026
