On Oct. 5, 2026 Anduril said the US Army awarded it a contract to expand the Next Generation Command and Control common data-layer baseline beginning with I Corps. The company put the initial base period at $162.8 million, with options that could bring the five-year total to $1.8 billion. InsideDefense reported the same figures and said the work is in the Pacific as NGC2 moves from division-level validation to I Corps. The $1.8 billion figure is an options ceiling, not a funded obligation.
/ Sources
/ About this story
Compiled by Venture Atlas from the sources above, using automated AI-assisted research. This is a summary of reporting published elsewhere, not original reporting - follow the source links for the full account. See our editorial standards.
Something wrong here? Email apostructura@gmail.com and we will fix it.
/ Related
- Anduril says Anduril-216 imaged the Moon in infraredWednesday, November 11, 2026
- Shield AI says Hivemind flew CCAs through air-combat maneuversWednesday, November 11, 2026
- Baltimore County approves a tax credit for Anduril's shipyardTuesday, November 3, 2026
- Anduril and Qualcomm unveil a U.S.-built BlueChip laptopTuesday, October 27, 2026
