Semiconductor research firm SemiAnalysis reported that Nvidia's Kyber NVL144 rack - a system packing 144 next-generation Rubin Ultra GPUs into a single NVLink domain - has slipped from 2027 to 2028 because its 'orthogonal backplane' printed-circuit midplane proved too defect-prone to manufacture at volume, and that a planned stopgap design was scrapped after customer pushback. Nvidia disputed the report, telling Bloomberg its 'road map is intact' and noting that its standard Rubin systems are already in full production. The two claims can both hold because the reported delay affects only the highest-density Rubin Ultra rack, not the base Rubin platform shipping in 2026.
/ Sources
/ About this story
Compiled by Venture Atlas from the sources above, using automated AI-assisted research. This is a summary of reporting published elsewhere, not original reporting - follow the source links for the full account. See our editorial standards.
Something wrong here? Email apostructura@gmail.com and we will fix it.
/ Related
- Meta launches about $35 billion in stock offeringsMonday, October 26, 2026
- Nvidia plans a 2.5x substrate capacity increaseThursday, October 22, 2026
- Mistral and Nvidia plan engineering AI benchmarksThursday, October 22, 2026
- Nvidia adds Confidential Bare Metal for model buildersThursday, October 22, 2026
