
BWRX-300
300 MWe Gen III+ boiling-water small modular reactor derived from the NRC-certified ESBWR, using natural circulation and passive safety systems, a 60-year design life, and proven GNF fuel. Designed for a power block that fits within two soccer fields and 24-36 month nth-of-a-kind construction. The first grid-scale SMR under construction in the Western world.




