NuScale Power

NuScale Power Module

In Development

Self-contained 77 MWe pressurized water reactor module with integrated steam generators.

Latest update Oct 31, 2026

NuScale Power Module

01

Current status

NRC Standard Design Approval (2020), Design Certification (2023), and uprated 77 MWe design approval (effective 2025) received. First physical module not yet constructed. On Oct. 29, 2026 NuScale and Doosan contracted the First Article of the upper reactor coolant system at Changwon. Neither the NuScale release nor Doosan's Oct. 29 notice states a price, a delivery date, or the customer project. Doosan calls it the first article for a commercial-project module and describes the part as the upper section of the reactor pressure vessel. The Sept. 1, 2026 MillenniTEK work fabricated first-of-a-kind boron-oxide ECCS pellets as part of manufacturing readiness.

02

Specifications7

Electrical Output
77 MWe per module
Thermal Output
250 MWt per module
Height
23 m (76 ft)
Diameter
4.6 m (15 ft)
Fuel Type
Standard LEU (< 5% enriched)
Refueling Interval
~18-24 months
NRC Certification
Design Certification

(2023); 77 MWe uprate approved (2025)

03

Upcoming milestones1

Announced next steps from NuScale Power that mention NuScale Power Module.

  1. 2026

    Due now

    Reach first-module manufacturing and fuel readiness

    NuScale says its main 2026 priority is ensuring full readiness to manufacture the first NuScale Power Module while scaling fuel and supply-chain support with partners such as Framatome. Components for 12 power modules are already in production; in June 2026 NuScale contracted Paragon Energy Solutions to complete final design of the module's safety-related instrumentation-and-control systems. On September 1, 2026 NuScale and MillenniTEK announced they had fabricated first-of-a-kind boron-oxide pellets for the module's passive emergency core cooling system, a concrete manufacturing-readiness step. The first physical module is still not complete.

  1. NuScale contracts Doosan for the first upper coolant article

    NuScale and Doosan Enerbility said on Oct. 29, 2026 that they signed a contract for Doosan to fabricate the First Article of the upper reactor coolant system for the NuScale Power Module at Changwon, Korea. Doosan says that system forms the upper section of the reactor pressure vessel and is for a module in a commercial project. Neither company disclosed the price, the delivery date, or the customer.

    www.nuscalepower.com www.doosanenerbility.com

  2. NuScale taps Paragon to finalize reactor safety control systems

    NuScale Power awarded Mirion's Paragon Energy Solutions a contract, announced June 16, to complete final design work on three instrumentation-and-control systems for the NuScale Power Module - the safety-related Module Protection System, the Safety Data Interface System for post-accident monitoring, and the Plant Protection System - all built on Paragon's Highly Integrated Protection System platform. The scope includes independent verification and validation of the Module Protection System software, a step toward qualifying the safety-critical controls. The award advances NuScale's supply chain as it already has components for 12 power modules in production.

    NuScale Power BusinessWire