CoreWeave, Inc. (Nasdaq: CRWV) sells a cloud built for AI training and inference. It was founded in September 2017, launched CoreWeave Cloud in 2020, and listed on Nasdaq in March 2025.
Michael Intrator is co-founder, chairman, and chief executive. On 10 November 2026 the company reported GAAP revenue of $3,661 million and a GAAP net loss of $709 million, or $1.27 a share, for the quarter ended 30 September 2026. Active power was over 1.7 GW after more than 200 MW added in the quarter, and contracted power was over 4.6 GW. The company still expects more than 1.85 GW of active power at year-end 2026. Revenue for 2025 was $5.1 billion. Headquarters remain in Livingston, New Jersey. A MarketScreener transcription of the 10 November earnings presentation states 52 active data centers as of 30 September 2026, including 9 added in 2026, and says the footprint graphic may not show every location. The earnings release does not state a site count. The 30 September documentation page still calls Vera Rubin NVL72 a limited-availability offering in US-CENTRAL-09A. The earnings release says multi-rack deployments were brought online for Cognition production workloads and does not call the instances generally available. On Nov. 16, 2026 CoreWeave said its MLPerf Training v6.1 submission trained DeepSeek-V3 671B to target quality in 17.65 minutes on 256 Rubin GPUs across racks, and Llama 3.1 8B in 7.16 minutes on one 72-GPU Vera Rubin NVL72 rack. It says those runs used production clusters and that the Closed division's Available category uses hardware customers can buy or rent. The MLCommons table lists submission 6.1-0073 at 7.162 minutes as Available on-premise. The post does not say the instances are generally available. RIN 0694-AK50 is on public inspection for Federal Register publication on Nov. 19, 2026, and is not effective as of Nov. 18. Once effective, listed advanced-computing items exported to Indonesia or Singapore need a license unless the ultimate consignee or end user is headquartered in the United States, or its ultimate parent is, and the exporter files the monthly section 743.10 report. A separate knowledge-based license applies when items are destined to a data center anywhere that will provide more than 12,000,000 aggregate TPP to a company headquartered in Country Group D:5 or Macau. CoreWeave's planned Indonesia and Singapore points of presence are network nodes scheduled from Q4 2026. The Indonesia PoP is described as connecting three data-center facilities announced for 2028. The company has not said a current overseas cluster supplies that volume of compute to a D:5 or Macau company. The two-page 7 November letter images were still not opened. On the earnings call Intrator said the overwhelming majority of Texas power is online or fully permitted and under construction. No transition-team reply naming which permitted projects may proceed was found.
MLCommons released MLPerf Training v6.1 on 16 Nov 2026, with 153 systems and 250 results, and said the round included Nvidia Rubin-generation GPUs and Google's TPUv7, called Ironwood, for the first time. The results explorer lists Nvidia's Hecate Rubin system at 3.947 minutes on Llama 3.1 8B with 512 GPUs and a CoreWeave Rubin system at 7.162 minutes with 72 GPUs. Nvidia says Vera Rubin NVL72 delivered up to twice the performance per GPU of its GB300 NVL72.
On Nov. 16, 2026 the Commerce Department's Bureau of Industry and Security released interim final rule RIN 0694-AK50. The copy is on display and still has a blank Federal Register date. It requires a license for advanced computing items destined for data centers that would give companies headquartered in Country Group D:5 or Macau access to more than 12 million aggregate total processing performance, including across linked data centers, and it adds licenses for exports to Indonesia, Malaysia, Singapore, Thailand, and Brazil unless the recipient is U.S.-headquartered and the exporter files a new report. Commercial recommender systems are excluded, existing covered services have 90 days after the effective date to get a license, and the text formally rescinds the January 2025 AI Diffusion Rule.
CoreWeave reported third-quarter revenue of $3,661 million, up from $1,365 million a year earlier, and a net loss of $709 million, or $1.27 a share. Revenue backlog was about $132.5 billion, active power was over 1.7 gigawatts, and contracted power was over 4.6 gigawatts. The company raised 2026 revenue guidance to $13.0 billion to $13.3 billion and capital-expenditure guidance to $37 billion to $39 billion.
Bloomberg Law reported on Nov. 7 that CoreWeave chief executive Michael Intrator sent Texas Governor-elect Gina Hinojosa a letter about present and future data-center projects. The reported statement says data-center growth must work for Texas, that CoreWeave strongly supports those principles, and that the company welcomes work with her transition team on completing permitted projects and on clear, durable standards for future development. The letter was not opened, and the article does not quote a reply.
CoreWeave said on Oct. 27, 2026 that most of a planned 22.5 megawatts of IT capacity is online at atNorth's DEN01 center in Copenhagen, its first site in Denmark, using Nvidia Blackwell systems. The company said the site takes its European footprint to nine data centers in five countries. It also said network points of presence in the UAE, India, Indonesia, Singapore, Australia, South Korea, and Japan will begin later in the fourth quarter of 2026, with a full loop planned for mid-2027.
Nvidia announced DSX POD on Oct. 21, a reference design that ships seven Vera Rubin racks with cabling and liquid cooling in a container weighing about 28,000 kilograms. Nvidia says this can cut the time for a new AI data center to start serving tokens from six months to 14 days, and it expects partner deliveries to start in early 2027. It also says dry-cooler designs can bring facility cooling water near zero, while CoreWeave and Google Cloud are among the companies it lists as exploring MaxLPS power software.
CoreWeave said on Oct. 7 that it will enter India with 240 megawatts of AI data-center capacity at AdaniConneX's Taloja campus in Navi Mumbai, split across three 80 MW buildings where it will be the sole tenant. It plans to deploy Nvidia's Vera Rubin platform, with the first phase expected in mid-2028 and an option to add another 240 MW. CoreWeave said it will open an India office and hire locally. As of its Aug. 11, 2026 earnings call it had about 4.2 gigawatts of contracted power. The company did not disclose the investment amount.
DEN01 and new points of presence, rechecked 10 Nov 2026
Majority of 22.5 MW online
exact megawatts not stated. Seven points of presence not described as turned up. Site count not raised above 51.
Active data centers, 30 Sept 2026
52
06
Operations & revenue
Operating status
Q3 2026 results reported
On 10 November 2026 CoreWeave reported third-quarter GAAP revenue of $3,661 million and a net loss of $709 million, or $1.27 a share. Revenue backlog was about $132.5 billion. Active power was over 1.7 GW and contracted power was over 4.6 GW. Full-year 2026 revenue guidance is $13.0 billion to $13.3 billion, and capital-expenditure guidance is $37 billion to $39 billion. Cash and cash equivalents were $4,122 million, with marketable securities of $62 million. Restricted cash was $1,405 million current and $877 million non-current. The earnings presentation transcription states 52 active data centers as of 30 September 2026, with 9 added in 2026, and says the graphic may not show every site. Vera Rubin NVL72 remains limited availability on the 30 September docs page. The release says multi-rack systems were brought online for Cognition and does not say they are generally available. Year-end active power is still expected above 1.85 GW.
Revenue streams
CoreWeave Cloud
The platform covers training, inference, data movement, iteration, and agentic workflows. Services are infrastructure, managed software, and application software, including storage, Mission Control, and developer tools. The filing does not split revenue among those lines.
Committed contracts
At June 30, 2026 revenue backlog was about $104 billion. That is remaining performance obligations plus other estimated future revenue under committed contracts. It is not revenue recognized in the quarter.
07
Timeline16
2026
Reads the unpublished remote-access rule against planned Asia nodes
The public-inspection text of RIN 0694-AK50 is scheduled for Federal Register publication on Nov. 19, 2026, and the rule says it becomes effective on publication. As of Nov. 18 it is not effective. Section 742.6 requires a license to export listed advanced-computing items to Indonesia or Singapore unless the ultimate consignee or end user is headquartered in the United States, or its ultimate parent is, and the exporter files the monthly report in section 743.10. Section 744.24 requires a license, with knowledge, for items destined to a data center anywhere that will provide more than 12,000,000 aggregate TPP to companies headquartered in Country Group D:5 or Macau. Existing services of that kind have 90 days after the effective date. CoreWeave's Oct. 28 blog schedules Indonesia and Singapore points of presence from Q4 2026 and says the Indonesia node will connect three data-center facilities announced in August. Those facilities were announced for 2028. The blog says the North America and Europe network is operating and does not say a current overseas cluster supplies that compute to a D:5 or Macau company. The rule does not name CoreWeave.
Reports multi-rack Vera Rubin MLPerf Training results
On Nov. 16, 2026 CoreWeave said it submitted MLPerf Training v6.1 results in the Closed division's Available category, which it says uses hardware customers can buy or rent today. It reported DeepSeek-V3 671B trained to target quality in 17.65 minutes on 256 Rubin GPUs and Spectrum-X Ethernet across racks, and Llama 3.1 8B in 7.16 minutes on one 72-GPU Vera Rubin NVL72 rack, 1.9 times its own 72-GPU GB200 result of 13.70 minutes. It said the runs used the same production clusters customers use. The MLCommons table lists submission 6.1-0073 at 7.162 minutes as Available on-premise, and submission 6.1-0070, the GB200 comparison, at 13.701 minutes, also Available on-premise. The company says its speedup ratios were not verified by MLCommons. The post does not say Vera Rubin NVL72 is generally available.
BIS releases a remote-access rule covering overseas AI clusters
On Nov. 16, 2026 BIS released interim final rule RIN 0694-AK50, on display with the Federal Register date still blank. It would require a license when advanced computing items supply more than 12 million aggregate TPP, including through linked data centers, to companies headquartered in Country Group D:5 or Macau, and for exports to Indonesia, Malaysia, Singapore, Thailand, and Brazil unless the recipient is U.S.-headquartered and reporting requirements are met. CoreWeave has already said points of presence in Indonesia and Singapore are planned. The rule does not name CoreWeave, and the 90-day clock for existing services starts only when the rule becomes effective.
Brings Vera Rubin NVL72 online for Cognition, not generally available
The 10 Nov 2026 earnings release says multi-rack NVIDIA Vera Rubin NVL72 deployments were brought online, with the first production workloads for Cognition. The 30 Sept documentation page, reread 14 Nov 2026, still calls the instances a limited-availability offering in US-CENTRAL-09A and says access is by request. The release and the call do not say the instances are generally available.
Dates 52 active data centers to 30 September
A MarketScreener transcription of the 10 Nov 2026 earnings presentation prints 52 active data centers and 9 added in 2026, with figures as of 30 Sept 2026. It says the footprint graphic may not precisely reflect every location or capacity. The earnings release states active power over 1.7 GW and contracted power over 4.6 GW and does not state a site count.
Reports third-quarter results
On Nov. 10, 2026 CoreWeave reported third-quarter revenue of $3,661 million, GAAP operating income of $207 million, and a net loss of $709 million, or $1.27 a share. Adjusted EBITDA was $2,256 million and adjusted operating income was $379 million. Revenue backlog was approximately $132.5 billion, defined as remaining performance obligations plus other estimated amounts under committed contracts, subject to delivery. Active power was over 1.7 GW after more than 200 MW added in the quarter, and contracted power was over 4.6 GW. 2026 revenue guidance is $13.0 billion to $13.3 billion. Capital-expenditure guidance is $37 billion to $39 billion, up from a stated prior range of $35 billion to $39 billion. Cash and cash equivalents were $4,122 million. The four debt lines sum to $46,873 million; the release does not print that total. The CEO said about $9 billion of customer prepayments and deposits are expected in the next three months.
Reports a letter to the Texas governor-elect
Stocktwits reported on 7 November 2026 that CoreWeave's head of global government affairs shared a letter from CEO Michael Intrator to Governor-elect Gina Hinojosa. The reported text supports communities sharing benefits without shouldering costs, says the company funds grid connections, cites closed-loop cooling, and names facilities in Austin, Denton, Dickens County, Plano, Richardson and Round Rock. It welcomes a clarification that permitted projects may be completed. The two-page letter was not opened. No transition-team reply naming projects was found. This does not change the 30 June count of 51 data centers or the statement that most of 22.5 MW at DEN01 is online.
Dates 51 data centers to June 30 and sets the Q3 call
On October 27, 2026 CoreWeave said it operated 51 data centers as of June 30, 2026, with more than 1.5 GW of active power, and set its third-quarter results call for November 10, 2026 at 5:00 p.m. Eastern Time. The same day's Copenhagen release says the majority of a planned 22.5 MW is online at atNorth DEN01 and that seven new points of presence begin later in Q4 2026. The October 28 blog says eight data centers were added in 2026 and that the Asia Pacific and Middle East points of presence are scheduled, not already online. No exact operating megawatt count for the 22.5 MW was stated.
2026
Says most of 22.5 MW is online in Copenhagen
On Oct. 27, 2026 CoreWeave said the majority of a planned 22.5 MW of IT capacity is online at atNorth DEN01 in Copenhagen, using Nvidia Blackwell systems, and that this is its first Denmark deployment. It said Europe is now nine data centers in five geographies. Points of presence in the UAE, India, Indonesia, Singapore, Australia, South Korea, and Japan are planned to begin later in Q4 2026, with a full loop in mid-2027. The release dates more than 1.5 GW of active power to June 30, 2026 and about 4.2 GW of contracted power to the Aug. 11 earnings call. It did not state how many of the 22.5 MW are operating.
Says HGX Rubin NVL8 is coming this quarter
On 21 Oct 2026 CoreWeave said NVIDIA HGX Rubin NVL8 is coming to CoreWeave Cloud this quarter. The post lists eight Rubin SXM GPUs, 2 TB of HBM4, 130 TB/s of aggregate memory bandwidth, and 265 TFLOPS of FP64 per node. It is not described as generally available. The 10x token figure and the 4x-fewer-GPU training comparison are attributed to NVIDIA or labeled as projections.
Puts Vera Rubin NVL72 into limited availability
On 2 Oct 2026 CoreWeave said NVIDIA Vera Rubin NVL72 is in limited availability, with hundreds of Rubin GPUs across multiple regions. Cognition is the first named production customer. Cognition reported up to 4.8x total token throughput on SWE-2 inference versus GB200 NVL72. The post says 3.8x output token throughput per GPU for reinforcement learning versus GB200 NVL72 at matched interactivity. This is select-customer access, not general availability.
Named among companies exploring Nvidia DSX MaxLPS
Nvidia's 21 Oct 2026 release says CoreWeave is exploring DSX MaxLPS and is among clouds exploring new DSX OS components. The summary says they are planning to use MaxLPS. Measured results in that release are Lambda's and Nscale's, not CoreWeave's. CoreWeave's own 2 Oct post says it plans next-generation factories with DSX reference designs, describes MaxLPS and DSX Flex, and says it uses DSX Air for simulations. That post does not publish a MaxLPS or DSX OS measurement.
Plans 240 MW India campus with AdaniConneX
On Oct. 7, 2026 CoreWeave said it will enter India with 240 megawatts of AI data-center capacity at AdaniConneX's Taloja campus in Navi Mumbai, in three 80 MW buildings where it will be the sole tenant. It plans Nvidia Vera Rubin systems, with first phase expected in mid-2028 and an option to add 240 MW. It said it will open an India office. The company restated about 4.2 gigawatts of contracted power as of its Aug. 11, 2026 earnings call and did not disclose the investment amount.
Second quarter reported
On August 11, 2026 CoreWeave reported GAAP revenue of $2,575 million for the quarter ended June 30, 2026. It said it completed the first bring-up and validation of NVIDIA Vera Rubin NVL72. The release does not describe Vera Rubin as generally available.
2025
Listed on Nasdaq
CoreWeave completed its public listing on Nasdaq under CRWV in March 2025. Revenue for the year ended December 31, 2025 was $5.1 billion, after $1.9 billion in 2024 and $229 million in 2023.
2017
Founded
CoreWeave was founded in September 2017. The 2025 Form 10-K says the CoreWeave Cloud platform launched in 2020.