Pacific Fusion

Demonstration System

In Development

Pacific Fusion's first-of-a-kind machine, to be assembled at the $1B Mesa del Sol campus in Albuquerque from 156 production-scale pulser modules (each 32 circular stages ringed with 10 bricks). It is designed to reach net facility gain, producing more fusion energy than the total energy stored in the system, and to do it at roughly 100x the facility gain of the National Ignition Facility for about a tenth of the cost.

Latest update Sep 16, 2026

Demonstration System

01

Current status

Under construction. Ground was broken on the Albuquerque campus on August 25, 2026, with components already being produced at the Los Lunas build center opened in December 2025; Nature reporters visiting Los Lunas that same month found two of the more than 150 full-scale production modules already completed. Pacific Fusion's Users Program FAQ, still current as of September 16, 2026, says Demonstration System commissioning is expected to begin in 2028, with net facility gain targeted by 2030. The company stresses this is a demonstration machine, not a power plant.

02

Specifications4

Pulser Modules
156

(each 32 stages x 10 bricks); 2 full-scale modules completed as of August 2026

Goal
Net facility gain by 2030

commissioning expected to begin 2028

Location
Mesa del Sol, Albuquerque, New Mexico

$1B campus

Groundbreaking
August 2026

03

Upcoming milestones5

Announced next steps from Pacific Fusion that mention Demonstration System.

  1. 2026-2027

    Test a full-scale production pulser module

    Complete and test full-scale pulser modules, each roughly 40x the size of Sirius and 3x the June 2026 scaled prototype, to prove the unit that will be manufactured 156 times over for the Demonstration System. Nature reporters visiting the Los Lunas build center in August 2026 found two of the more than 150 full-scale modules already completed. Re-verified as of September 16, 2026: company updates through September 15 still describe demonstrating a full-scale pulser module as the next major technical checkpoint; no public full-scale module test result has been posted.

  2. 2026-2030

    Build the 156-module Demonstration System

    Manufacture and assemble all 156 production-scale pulser modules at the New Mexico campus, supported by component production at the Los Lunas build center, and integrate them with the target chamber and diagnostics. Ground was broken August 25, 2026; Users Program FAQ still dates commissioning to 2028.

  3. 2027-2029

    Open the Users Program to outside researchers

    Pacific Fusion launched the Users Program on March 4, 2026 with a call for Expressions of Interest from academia, national labs, government and industry; submissions are now closed. The Users Program FAQ, still current as of September 16, 2026, keeps the next phase as a detailed Call for Proposals in 2027, with Demonstration System commissioning expected to begin in 2028 and the first external-user campaigns anticipated in 2029.

  4. 2028

    Begin Demonstration System commissioning

    After manufacturing and assembling the 156-module Demonstration System at Mesa del Sol, Pacific Fusion's Users Program FAQ, still current as of September 16, 2026, says commissioning is expected to begin in 2028, ahead of first external-user campaigns in 2029 and the 2030 net-facility-gain target. Watch whether that 2028 window holds as full-scale pulser-module testing proceeds.

  1. Pacific Fusion breaks ground on $1 billion New Mexico campus

    Pacific Fusion held a groundbreaking ceremony on August 25 for its $1 billion research and manufacturing campus at Mesa del Sol in Albuquerque, which will house the Demonstration System the company is targeting for net facility gain by 2030. The event drew board chairman Eric Schmidt, US Senators Martin Heinrich and John Hickenlooper, NNSA administrator Brandon Williams and Sandia National Laboratories director Laura McGill, with the project expected to create about 200 permanent jobs.

    Albuquerque Journal KRQE

  2. Pacific Fusion's Sirius pulser passes 3,000 shots at Livermore

    Pacific Fusion and Lawrence Livermore National Laboratory reported that Sirius, their four-stage impedance-matched Marx generator prototype, has completed 3,000 full-power shots, each delivering 60 gigawatts in a 100-nanosecond pulse at 95% energy efficiency. The reliability campaign provides the empirical base for the much larger 156-module Demonstration System Pacific Fusion is targeting for net facility gain by 2030.

    Pacific Fusion ANS Nuclear Newswire