Tokamak Energy

ST40

Upgrade shutdown

Compact high-field spherical tokamak operating at the company's Oxfordshire campus since 2018 and the machine behind its plasma records. The spherical geometry confines plasma more efficiently per unit of magnetic field than a conventional tokamak, which is what makes a smaller, cheaper power plant plausible.

Latest update Aug 31, 2026

ST40

01

Current status

Closed out its 2025 campaign in December with three records (1 MA plasma current, highest stored energy, triple product up 30%+) and entered the $52M DOE/DESNZ-funded LEAPS upgrade shutdown that runs through most of 2026, including a new Rockwood Group-built high-field centre column replacing the original after more than 5,000 plasma pulses. The upgrade also adds lithium-coated all-metal plasma-facing components, an upgraded Thomson scattering diagnostic and radiofrequency heating; the gyrotron heating system passed site acceptance testing in July 2026 and the next experimental campaign is scheduled for 2027-2028.

02

Specifications4

Ion Temperature
100 million °C

2022, first for a privately owned tokamak

Plasma Current
1 MA (Dec 2025)
Triple Product
~8 (±2) x 10^18 m^-3 keV s
Upgrade Programme

$52M, five years, funded in equal thirds by DOE, DESNZ and Tokamak Energy

03

Upcoming milestones2

Announced next steps from Tokamak Energy that mention ST40.

  1. 2026-2029

    Deliver the first STEP magnet work packages

    Execute the eight magnet work packages under the £70M STEP contract with UK Fusion Energy, covering magnets, tokamak systems and plasma integration, and use ST40 as the test bed for magnetic configurations feeding STEP's later design phases. After the company said it will not construct its own pilot plants, STEP is the flagship construction programme Tokamak Energy is attached to. The September 9, 2026 Demo4 campaign close is already feeding STEP model-coil testing.

  2. 2027-2028

    Complete the $52M ST40 upgrade and restart experiments

    Finish installing the new Rockwood Group-built centre column, lithium-coated all-metal plasma-facing components, the gyrotron radiofrequency heating system that passed site acceptance testing in July 2026, and the rest of the DOE/DESNZ-funded LEAPS upgrade package, then bring ST40 back online for the next campaign studying RF start-up and ramp-up and lower-recycling regimes. Re-verified September 17, 2026: ST40 remains in the upgrade shutdown; Tokamak Energy's latest news is the Demo4 campaign close, with no ST40 restart announced.