Eve Air Mobility logo

Eve Air Mobility

APublic (NYSE: EVEX)Founded 2020🇧🇷Melbourne, Florida / São José dos Campos, Brazil
CEO

Johann Bordais

Majority-owned by

Embraer S.A.

Data verified as of Jul 17, 2026

Summary

Eve Air Mobility (Eve Holding) is the Embraer-backed eVTOL developer, spun out of the EmbraerX innovation arm in 2020 and NYSE-listed since a 2022 SPAC merger, with Brazilian BDRs on the B3 since 2025. Its lift-plus-cruise aircraft — eight fixed-pitch lift rotors, a pusher propeller, Embraer fifth-generation fly-by-wire, four passengers plus a pilot, ~100 km range — flew its full-scale engineering prototype for the first time in December 2025 and completed a 59-flight hover/low-speed test block in May 2026, with transition flights slated for summer 2026. Eve holds the industry's largest order pipeline: ~2,700 aircraft (~$14B) in non-binding LOIs from 28 customers plus ~$500M in binding orders from Revo (São Paulo) and Japan's AirX. ANAC type certification and entry into service are targeted for 2028 (revised from 2027 in May 2026), backed by a record $577.7M in liquidity the company says funds it through certification, and a Taubaté, Brazil plant scaling to 480 aircraft/year. It also sells Vector, its urban air-traffic-management software, to 14 customers.

Main Products

Eve eVTOL

Eve eVTOL

In Development

Lift-plus-cruise eVTOL carrying four passengers plus a pilot: eight dedicated fixed-pitch vertical-lift rotors, one aft pusher propeller, and Embraer fifth-generation fly-by-wire, with a ~100 km range. Electric motors supplied by Beta Technologies; cabin by Diehl Aviation.

Full-scale engineering prototype first flew December 19, 2025; completed the hover/low-speed test block in May 2026 (59 flights, 100+ test points). Partial transition flights slated for summer 2026; six conforming prototypes enter production later in 2026; ANAC certification targeted 2028.

Passengers4 + 1 pilot
Range~100 km (60 mi)
Architecture8 lift rotors + 1 pusher propeller (lift-plus-cruise)
Flight-Test Progress59 flights, 100+ test points (hover block complete, May 2026)

What's Next

First transition flights of the engineering prototype

Partial transition flights at ~30 kt are slated for summer 2026, building toward full wingborne flight above 85 kt by the end of the year — the decisive aerodynamic milestone for the lift-plus-cruise design, confirmed on track at Farnborough in July 2026.

Q3 2026

Start production of six certification-conforming prototypes

Production of six conforming prototypes begins later in 2026 with the first assembly completed around year-end and roughly a one-per-month cadence thereafter; the first piloted flight is targeted for mid-2027, opening the ~12-month conforming flight-test campaign ANAC requires.

Late 2026

ANAC type certification and entry into service

Type certification by Brazil's ANAC and entry into service are targeted for 2028 (revised from 2027 in May 2026). Launch operator Revo plans São Paulo operations, and the Taubaté plant's first 120-aircraft/year module must be ready to support initial deliveries.

2028

Track Record

0 of 1 announced date hit · 1 slipped

ANAC type certification and entry into service

Target 2027 · Resolved May 7, 2026

In May 2026, alongside completion of the hover/low-speed test block, Eve moved its ANAC type-certification and entry-into-service target from 2027 to 2028, citing the ~12 months of conforming-vehicle flight testing still required.

Slipped

Operations & Revenue

StatusFlight-test campaign — transition flights imminent

Eve is deep in its engineering-prototype flight-test campaign: 59 flights through the May 2026 completion of the hover/low-speed block, with partial transition flights slated for summer 2026, full wingborne transitions later in 2026, and production of six certification-conforming prototypes starting later this year (first piloted flight targeted mid-2027). ANAC type certification and entry into service moved from 2027 to 2028. The company reported record liquidity of $577.7M at Q1 2026 and says it is funded through certification — notable resilience in a sector where Textron, Hyundai, and Airbus have paused eVTOL programs.

Revenue Streams

eVTOL Aircraft Sales

The core future business: ~2,700 aircraft in non-binding LOIs (~$14B) across fixed-wing operators, helicopter operators, lessors, and ride-share platforms, plus binding deals with Revo ($250M, up to 50 aircraft) and AirX (2 firm + 48 options), with deliveries from 2028–2029.

Vector — Urban ATM Software

SaaS air-traffic-management platform for eVTOL fleet operators, vertiport operators, and air-navigation service providers — 14 customers signed, moving toward an operational trial version.

TechCare Aftermarket Services

Eve's service and support package — maintenance, parts, and lifecycle services — bundled into the Revo and AirX agreements alongside the aircraft themselves.

Key Metrics

Employees

~200 direct (plus 800+ engineers contracted from Embraer)

Est. Annual Revenue

Pre-revenue during aircraft development. Q1 2026: net loss $68.8M; FY2025: net loss $224.3M; 2026 cash-burn guidance $225–275M, with liquidity supporting operations through 2028

Order Pipeline

~2,700 aircraft / ~$14B in non-binding LOIs from 28 customers + ~$500M binding (Revo, AirX)

Liquidity

$441.1M cash + investments; $577.7M total liquidity (record, Q1 2026) — funded through 2028

Certification Target

ANAC type certification + entry into service in 2028 (revised from 2027 in May 2026)

Planned Production Capacity

Up to 480 aircraft/year at Taubaté, Brazil (4 modular phases of 120)

Market Cap

~$777M (July 16, 2026; $2.23/share — 52-week range $2.23–$7.48)

Timeline

2026AirX signs first Asia-Pacific binding order

Tokyo-based AirX signs a firm order for 2 aircraft with options for 48 more (potential value ~$150M) at the Singapore Airshow in February 2026, with deliveries from 2029 — Eve's second binding customer after Revo.

2026Hover test block complete; certification slips to 2028

By May 2026 the prototype completes its hover/low-speed block — 59 flights, 2h27m airtime, 100+ test points — and Eve moves its ANAC type-certification and entry-into-service target from 2027 to 2028. At Farnborough in July, the company confirms partial transition flights for the summer, full transitions later in 2026, and the start of production of six conforming prototypes.

2025First binding order — Revo signs $250M framework agreement

São Paulo helicopter operator Revo (owned by Omni Helicopters International) signs Eve's first binding deal in June 2025: a $250M framework agreement for up to 50 aircraft including TechCare support and Vector software.

2025$230M raise with B3 dual listing; full-scale prototype flies

In August 2025 Eve raises $230M from BNDESPAR, Embraer, and institutional investors and dual-lists BDRs on Brazil's B3 (EVEB31), taking total capital raised past $1B. On December 19, the full-scale engineering prototype completes its first flight — an uncrewed hover at Embraer's Gavião Peixoto facility validating fly-by-wire controls and the eight lift rotors.

2024BNDES finances the Taubaté production plant

Brazil's development bank BNDES lends Eve $88M under the Mais Inovação program to build its first eVTOL factory in Taubaté, São Paulo — modular capacity scaling to 480 aircraft/year — extending a $92.5M credit line from 2022. Eve also raises $94M in new equity during 2024.

2022NYSE listing via Zanite SPAC; United Airlines orders 200

Eve closes its business combination with Zanite Acquisition Corp. on May 9, 2022, listing on the NYSE as EVEX at a ~$2.9B valuation with $377M in gross proceeds. In September, United Airlines invests $15M and signs a conditional purchase agreement for 200 aircraft plus 200 options.

2020Eve spun off from EmbraerX

Eve is founded on October 15, 2020 as an independent Embraer company, inheriting the eVTOL aircraft program plus the Vector urban air-traffic-management software line.

2018EmbraerX unveils its eVTOL concept

Embraer's innovation arm EmbraerX publicly presents the eVTOL concept that becomes the Eve program, applying the airframer's certification and engineering pedigree to urban air mobility.

Funding

Cumulative disclosed raise · dated rounds

$500M$1B2023202420252026$959M raised
RoundDateAmountInvestorsSource
SPAC Merger (Zanite Acquisition Corp.)May 2022$377M gross (incl. $357M PIPE)Public listing (NYSE: EVEX) at ~$2.9B valuation; PIPE incl. Embraer, Zanite sponsors, strategic aviation partners
United Airlines InvestmentSeptember 2022$15MUnited Airlines — alongside a conditional order for 200 aircraft + 200 options
BNDES Financing2022 & October 2024$92.5M credit line + $88M loanBNDES (Brazil's development bank) — 2024 loan funds the Taubaté plant, 16-year maturity
Equity Raise2024$94MNew equity supporting eVTOL development
Equity Raise + B3 Dual ListingAugust 2025$230MBNDESPAR, Embraer, institutional investors (47.4M shares at $4.85); BDRs listed on B3 as EVEB31
Syndicated LoanJanuary 2026$150M5-year facility — lifted total liquidity to a record $577.7M