Summary

TerraPower is a nuclear innovation company founded by Bill Gates with two business lines: the Natrium sodium fast reactor with integrated molten-salt energy storage, and TerraPower Isotopes, a medical-isotope business producing actinium-225 for targeted cancer therapies. In March 2026 the NRC issued Kemmerer Unit 1 the first construction permit for a commercial-scale advanced nuclear plant in the U.S., and on April 23, 2026 TerraPower and contractor Bechtel officially began plant construction in Wyoming, a build expected to mobilize roughly 1,600 workers; on July 21, 2026 TerraPower became the first advanced-reactor developer accepted into the Institute of Nuclear Power Operations. In January 2026 TerraPower signed a landmark agreement with Meta to develop up to eight Natrium plants in the U.S., marking a shift from a single demonstration toward a commercial fleet, and on August 14, 2026 it deepened its Korean industrial supply chain with a preliminary joint-business agreement with SK Innovation for South Korea's first commercial Natrium plant, selection of Hyundai Engineering & Construction as EPC contractor for up to eight future Natrium reactors, and a reactor-vessel manufacturing contract with Doosan Enerbility. On August 31, 2026 it awarded 12 additional supplier contracts for Kemmerer Unit 1 and an on-site sodium test and fill facility. CEO Chris Levesque has said TerraPower plans to announce a second Natrium project - this one for an AI data-center customer - before the end of 2026. The core reactor business remains pre-revenue, but Natrium has moved from development into full project execution under DOE's ARDP cost-share program, while TerraPower Isotopes already sells actinium-225 commercially to pharmaceutical partners and is building a $450 million second production facility in Philadelphia.

Company OverviewRead the long-form profile of TerraPower

/ Recent News

View all →
  • View all news

    Browse the daily archive

Main Products

Natrium

Natrium

In Development

Sodium-cooled fast reactor with integrated molten salt energy storage, enabling flexible output from 345 MWe to 500 MWe peak.

Demonstration plant (Kemmerer Unit 1) under construction in Wyoming - NRC construction permit issued March 2026, construction started April 2026 with contractor Bechtel, with construction completion targeted by ~February 2031 and commercial operation in the early 2030s. A January 2026 Meta agreement covers up to eight additional Natrium plants, and May 2026 agreements with HD Hyundai and HDEC support component manufacturing and EPC delivery for the commercial fleet.

Electrical Output345 MWe (baseload)
Peak Output500 MWe (with storage)
Reactor TypeSodium-cooled fast reactor (HALEU-fueled)
Energy StorageMolten salt (boosts 345→500 MWe for 5.5+ hours)
Demo Plant LocationKemmerer, Wyoming
Target OperationEarly 2030s (construction complete ~Feb 2031)
Molten Salt Energy Storage

Integrated thermal energy storage system using molten salt to decouple reactor output from grid delivery, enabling peak power output.

Part of the Natrium system - allows flexible power dispatch to complement intermittent renewables.

Storage TypeMolten nitrate salt
Peak Boost345 MWe → 500 MWe
Duration5.5+ hours at peak
PurposeGrid flexibility / renewable complement

Medical-isotope business producing actinium-225 (Ac-225), a rare alpha-particle-emitting isotope used in targeted radiotherapeutics for cancers including prostate, breast, colon, and neuroendocrine cancers, melanoma, and lymphoma.

Producing Ac-225 at commercial scale via weekly production runs since October 2024, supplying pharmaceutical partners for radiopharmaceutical development and human clinical trials from its Everett, Washington facility. A second, larger cGMP facility (the Bellwether Laboratory in Philadelphia, $450M investment, 250,000 sq ft) broke ground May 6, 2026 and is intended to expand global Ac-225 capacity twentyfold, with production starting in 2029. TerraPower Isotopes sources its thorium-229 feedstock from DOE contractor Isotek Systems at Oak Ridge; a new Isotek analytical lab opened August 21, 2026 speeds Th-229 delivery and supports the decay-based technique TerraPower uses to extract Ac-225.

Production StatusCommercial scale (weekly production runs since Oct. 2024)
Philadelphia Facility Investment$450M (Bellwether Laboratory, 250,000 sq ft)
Philadelphia Facility Production Start2029

What's Next

Execute Kemmerer Unit 1 construction

With construction underway alongside contractor Bechtel and a workforce mobilizing toward ~1,600 (Kemmerer is advancing temporary workforce-housing zoning to accommodate the ramp), TerraPower's central execution challenge is building Kemmerer Unit 1 on schedule. Early work is focused on the non-nuclear energy island under the January 2025 Wyoming state construction permit, with the nuclear island to follow under the March 2026 NRC construction permit's operating-license phase; project owner US SFR Owner LLC has told the NRC it is targeting fuel loading around 2030 and expects to complete construction by February 2031, ahead of commercial operation targeted in 2031.

Construction complete ~Feb 2031

First sodium reactor criticality

Targeting initial criticality of the Natrium reactor at the Kemmerer plant, marking the first sodium-cooled fast reactor to operate in the U.S. in decades, following fuel loading targeted around 2030 and ahead of construction completion (~February 2031) and commercial operation (2031). Not yet achieved as of August 2026; Natrium is not part of the separate federal push (a 2025 executive order and DOE Reactor Pilot Program) for other advanced-reactor developers to reach criticality by July 2026, since Kemmerer Unit 1 is following the NRC's standard two-step Part 50 licensing path instead.

Early 2030s

Secure HALEU fuel supply

Natrium operation depends on securing adequate HALEU fuel through TerraPower's partnerships with Centrus, Framatome, GNF-A, and ASP Isotopes, plus completing supporting fuel-fabrication and sodium test-and-fill infrastructure under the ARDP program. ASP Isotopes' definitive agreements with TerraPower (a loan for its planned South Africa enrichment facility plus a long-term supply contract for up to 150 metric tons of HALEU over the 2028-2037 period) remain on track toward supply beginning in 2028, alongside TerraPower's DOE HALEU Availability Program allocation.

Late 2020s

Submit Kemmerer Unit 1 operating license application

File the Part 50 operating license application for Kemmerer Unit 1 with the NRC, the second step of the two-step construction-permit-then-operating-license process, which TerraPower has said it is targeting for March 2028 - a milestone the company has been preparing for in part through its July 2026 admission to the Institute of Nuclear Power Operations.

By March 2028

Begin commercial Natrium fleet under Meta agreement

Move the January 2026 Meta agreement for up to eight Natrium plants from early development into deployment, with the first commercial units targeted to come online as early as 2032. TerraPower's May 2026 commercialization agreements with HD Hyundai and HDEC are intended to build out the component-manufacturing and EPC supply chain needed to deliver the fleet at scale. Cheyenne, Wyoming - home to Meta's large Project Cosmo data center campus - has emerged as a leading candidate site for the initial dual-reactor unit, though TerraPower and Meta had not formally confirmed a site as of mid-2026.

2032

Advance Natrium through UK Generic Design Assessment

Having submitted its GDA application in October 2025, received formal acceptance from the UK Department for Energy Security and Net Zero in February 2026, and started Step 1 of the three-step regulatory review on June 5, 2026 through subsidiary TerraPower UK Ltd, progress the multi-year process toward a first UK Natrium deployment, which TerraPower has said it is targeting for the early-to-mid 2030s.

Early-to-mid 2030s

Bring Bellwether Laboratory (Philadelphia) online

Complete construction of the $450M, 250,000-square-foot Bellwether Laboratory in Philadelphia's Bellwether District (groundbreaking May 6, 2026) and begin cGMP actinium-225 production there, expanding TerraPower Isotopes' global Ac-225 capacity twentyfold alongside its existing Everett, Washington site. Not yet online as of August 2026; no completion date beyond the 2029 production-start target has been announced, and no delay has been reported.

2029

Announce second Natrium plant, for an AI data center customer

CEO Chris Levesque said TerraPower plans to announce its next Natrium project before the end of 2026, this time for an unnamed AI data center customer rather than Kemmerer's utility-scale grid role, putting the company on track to break ground on its second plant in 2027. The disclosure follows TerraPower's August 14, 2026 agreements with Hyundai E&C and SK Innovation to help standardize and scale Natrium construction for a commercial fleet.

By end of 2026

Operations & Revenue

StatusPre-revenue

Pre-revenue, but no longer just at the concept stage. Kemmerer Unit 1 received an NRC construction permit in March 2026 and entered full construction with contractor Bechtel on April 23, 2026, mobilizing toward roughly 1,600 workers at peak; that ramp is now visible on the ground, with Kemmerer's city council advancing zoning changes through the summer of 2026 - including a third and final reading on July 28, 2026 rezoning the roughly 60-acre Fox King property from heavy to light industrial - to allow temporary workforce housing ('man camp' sites, capped at 50 dwelling units under the council's June 2026 ordinance) near the plant, though city officials note no man camp is yet guaranteed. Because Natrium is being built under a two-step Part 50 process, early construction work is concentrated on the non-nuclear energy-storage island (under a January 2025 Wyoming state permit) while the reactor (nuclear) island follows under the separate NRC operating-license phase; project owner US SFR Owner LLC has told the NRC it expects to complete construction by February 2031, with commercial operation targeted in 2031. A January 2026 agreement with Meta for up to eight Natrium plants and 2026 commercialization agreements with HD Hyundai, HDEC, SK Innovation, and Doosan Enerbility position TerraPower among the most commercially advanced U.S. advanced-reactor developers, and on July 21, 2026 it became the first advanced-reactor company accepted into the Institute of Nuclear Power Operations (INPO) at the operating-member level.

Pipeline & Contracts

DOE Cost-Share Funding

$2B+ from DOE's Advanced Reactor Demonstration Program to build the Natrium demonstration plant.

Private Investment & Partnerships

Significant investment from Bill Gates, SK Group, and venture partners funding reactor development and demonstration.

Commercial Reactor Deployment (Meta Agreement)

January 2026 agreement with Meta to develop up to eight Natrium plants (up to 2.8 GW baseload, 4 GW peak with storage); Meta funds early development of two units and holds rights to six more - TerraPower's path to commercial revenue beyond the Kemmerer demonstration.

TerraPower Isotopes (Actinium-225 Sales)

TerraPower's nearer-term commercial line: producing and selling actinium-225, a medical isotope used in targeted alpha-particle cancer therapies, at commercial scale via weekly production runs since October 2024, under supply agreements with pharmaceutical partners including AtomVie Global Radiopharma, Ratio Therapeutics, and Clarity Pharmaceuticals. A $450M Philadelphia facility (breaking ground May 2026, production from 2029) is intended to expand capacity twentyfold, and a June 2026 expanded collaboration with Belgian producer PanTera adds a new Ac-225 production line at IRE's Fleurus site.

Key Metrics

Employees

~1,000

Est. Annual Revenue

Pre-revenue

DOE ARDP Federal Cost Share

Up to $2B (50/50 cost share)

Natrium Output

345 MWe (500 MWe peak)

Kemmerer Unit 1 Status

Under construction (started Apr. 23, 2026); energy island proceeding under the January 2025 Wyoming state permit while the nuclear island follows under the March 2026 NRC construction permit; fuel loading targeted around 2030, construction complete ~Feb 2031, commercial operation 2031

Commercial Fleet (Meta Agreement)

Up to 8 Natrium plants

Construction Workforce

~1,600 workers (peak); ~250 permanent staff once operational

TerraPower Isotopes Capacity Expansion

20x increase in global Ac-225 production capacity (Everett, WA + new Philadelphia facility)

Timeline

2026Meta agreement for up to eight Natrium plants

In January 2026 TerraPower signs a landmark agreement with Meta to develop up to eight Natrium reactor-and-storage plants in the U.S. - up to 2.8 GW of baseload power, boostable to 4 GW with the molten-salt storage. Meta funds early development of two units and holds rights to six more, with first units targeted as early as 2032.

2026NRC permit issued and full Natrium construction begins

The NRC issues the first construction permit for a commercial-scale advanced nuclear plant in the U.S. on March 4, 2026, and TerraPower together with contractor Bechtel officially begins construction of Kemmerer Unit 1 on April 23, 2026, a build expected to mobilize roughly 1,600 workers.

2026Korean commercialization agreements with HD Hyundai and HDEC

On May 20, 2026 TerraPower signs a set of Natrium commercialization agreements with HD Hyundai and Hyundai Engineering & Construction (HDEC): a supply framework agreement naming HD Hyundai Heavy Industries a preferred manufacturer for components of the Natrium Reactor Enclosure System, and a tripartite strategic agreement/MOU to collaborate on design, manufacturing, supply chain, construction, commercialization, and delivery of a fleet of Natrium reactor-and-storage plants. HD Hyundai had already invested $30M in TerraPower in 2022.

2026Natrium enters UK Generic Design Assessment

On June 16, 2026 TerraPower's Natrium reactor formally enters the UK's Generic Design Assessment - the Office for Nuclear Regulation-led licensing process that evaluates a reactor's safety, security and environmental case independent of a specific site - and the company launches a UK subsidiary, TerraPower UK Ltd, to pursue British deployment. It is TerraPower's first regulatory step toward building Natrium plants in the UK.

2026First advanced reactor company to join INPO

On July 21, 2026 TerraPower is accepted into the Institute of Nuclear Power Operations (INPO), becoming the first advanced-reactor developer admitted to the industry safety group whose membership has historically been limited to operators of existing commercial nuclear plants. The move aligns TerraPower with INPO's operational-excellence and safety standards as it builds toward submitting a Kemmerer Unit 1 operating license application by 2028.

2026TerraPower Isotopes announces $450M Philadelphia cGMP facility

On March 17, 2026 TerraPower Isotopes unveils plans to invest $450 million in a cGMP actinium-225 manufacturing facility in Philadelphia's Bellwether District, which together with capacity expansion at its existing Everett, Washington site is intended to increase global Ac-225 production capacity twentyfold.

2026Groundbreaking on Bellwether Laboratory in Philadelphia

On May 6, 2026 TerraPower Isotopes breaks ground on the 250,000-square-foot Bellwether Laboratory in Philadelphia's Bellwether District, its flagship actinium-225 manufacturing facility; cGMP production is scheduled to begin in 2029.

2026TerraPower Isotopes expands PanTera collaboration

On June 2, 2026 TerraPower Isotopes and Belgian radioisotope producer PanTera expand their existing actinium-225 collaboration: Belgium's Institut des Radioeléments (IRE) in Fleurus will host and operate a new Ac-225 production line for PanTera, with TerraPower Isotopes supplying additional starting material, while PanTera separately builds a photonuclear production plant in Mol. The new IRE line is expected to become operational within about 18 months.

2026SK Innovation JV agreement and HDEC named EPC contractor for Korea fleet

On August 14, 2026 TerraPower signed a preliminary global joint-business agreement with SK Innovation - covering South Korea's first commercial Natrium plant and potential overseas projects - and selected Hyundai Engineering & Construction (HDEC) as the engineering, procurement and construction contractor for up to eight future Natrium reactors, with completion, price and performance guarantees intended to support conventional commercial financing. The agreements were signed in Seoul with TerraPower chairman Bill Gates, SK Group chairman Chey Tae-won, and South Korea's Trade, Industry and Energy Minister Kim Jung-kwan; South Korea's Doosan Enerbility separately won a TerraPower contract to manufacture Natrium's reactor vessel and internal structures, deepening the Korean industrial supply chain first established in TerraPower's May 2026 HD Hyundai agreements.

2026New ORNL analytical lab speeds Th-229 supply for Ac-225 production

On August 21, 2026 the Department of Energy's Oak Ridge Office of Environmental Management and contractor Isotek Systems open a new analytical laboratory (Building 2026) at Oak Ridge National Laboratory that speeds cleanup of ORNL's uranium-233 inventory and accelerates delivery of thorium-229 to TerraPower Isotopes, which is contracted to extract actinium-225 from that Th-229 using a radioisotope decay-based technique. The faster analysis shortens shipment delays that previously required sending samples elsewhere for testing, supporting TerraPower Isotopes' commercial-scale Ac-225 supply to pharmaceutical partners.

2026Awards 12 supplier contracts for Kemmerer Unit 1 and sodium test facility

On August 31, 2026 TerraPower announced 12 additional supplier awards supporting construction of Kemmerer Unit 1 and completion of the first-of-a-kind on-site sodium test and fill facility. Vendors include Merrick (pin-removal cell and sodium cover-gas monitoring skids), Mirion (plant cyber system), BWXT Canada (control rod drives), Teledyne Brown, Marmen, Thermal Engineering International, Jensen Hughes, Boston Government Services, James Fisher Technologies, KROHNE Nuclear, and Valserve.

2025$650M growth round led by NVIDIA's NVentures

TerraPower closes a $650 million private funding round including NVIDIA (via its NVentures venture arm, marking Nvidia's first energy investment), returning backer Bill Gates, and HD Hyundai, funding continued Natrium development and the TerraPower Isotopes program.

2024Site work and project preparation advance

TerraPower advances early project work in Kemmerer ahead of receiving the NRC construction permit for the first Natrium plant.

2024TerraPower Isotopes reaches market-scale Ac-225 production

TerraPower Isotopes announces it is producing actinium-225 at commercial scale via weekly production runs, supplying the global pharmaceutical industry for radiopharmaceutical development, including drugs in human clinical trials.

2022Kemmerer site selected

Selects Kemmerer, Wyoming (former coal town) as site for first Natrium demonstration plant.

2020DOE ARDP award

Receives $2B+ cost-share award under DOE's Advanced Reactor Demonstration Program.

2019Natrium design unveiled

Pivots to the Natrium sodium-cooled fast reactor with integrated molten salt storage.

2015China partnership

Signs agreement with China National Nuclear Corporation (CNNC) for TWR development.

2010Traveling wave reactor concept

Develops the traveling wave reactor (TWR) design that can run on depleted uranium.

2008Founded

Bill Gates and a group of technologists found TerraPower to develop advanced nuclear energy.

Funding

Cumulative disclosed raise · dated rounds

$2B$4B$6B20082012201620202024$4.5B raised
RoundDateAmountInvestorsSource
Founder & early investors2008–2018$1B+Bill Gates, Khosla Ventures, venture partners
DOE ARDP cost-share2020$2B+ (government share)U.S. Department of Energy
Series B (two closes)2022$830M ($750M in Aug. 2022 + $80M add-on in Nov. 2022)SK Group (SK Inc./SK Innovation), Bill Gates, ArcelorMittal (XCarb Innovation Fund), Korea Shipbuilding and Offshore Engineering (HD Hyundai), others
Growth round2025-06$650MNVIDIA (via NVentures), Bill Gates, HD Hyundai

/ Related Companies

All Nuclear Fission
Oklo logo

Oklo

Nuclear Fission +1

Oklo is developing fast-fission power plants under its Aurora product line while building a vertically integrated nuclear business around power sales, fuel recycling, and radioisotopes. Aurora units are designed to produce 15-75 MWe and run on fresh, recycled, or down-blended fuel, targeting customers such as data centers, industrial sites, military facilities, utilities, and remote communities. Its first plant, Aurora-INL at Idaho National Laboratory, is advancing under DOE's Reactor Pilot Program - the DOE approved its Preliminary Documented Safety Analysis on June 11, 2026, leaving the final Documented Safety Analysis as the last safety-basis step before authorization. Oklo is deepening vertical integration through the June 2026 acquisitions of Oak Ridge precision manufacturer ARMEC and sodium-systems engineering firm Creative Engineers, plus its May 2026 selection for DOE's Surplus Plutonium Utilization Program, while Atomic Alchemy builds U.S. isotope supply around the Groves test reactor in Lockhart, Texas, which reached first criticality on August 5, 2026.

Aalo Atomics logo

Aalo Atomics

Nuclear Fission

Aalo Atomics is an Austin-based nuclear startup founded in 2023 by CEO Matt Loszak and CTO Yasir Arafat (former lead of INL's MARVEL microreactor) to mass-manufacture sodium-cooled reactors purpose-built for AI data centers. Its product line pairs the factory-built 10 MWe Aalo-1 reactor with the Aalo Pod, a 50 MWe 'extra modular' plant that clusters five reactors and is designed to install in months. Selected for the DOE's Reactor Pilot Program in August 2025, Aalo brought its Aalo-X Critical Test Reactor at Idaho National Laboratory to first criticality on July 4, 2026 - the fourth DOE-authorized advanced reactor to meet Executive Order 14301's deadline, less than eight months after groundbreaking. The company has raised over $300 million, including a $100M Series B led by Valor Equity Partners, and was negotiating a roughly $500M Series C at a $4-5B valuation as of mid-2026 to help fund the planned one-million-square-foot 'GigaWatt Factory' beyond its 40,000 sq ft Austin pilot plant, which it said in July 2026 would expand tenfold to 400,000 sq ft within a year while it hires 100-200 more staff. On July 30, 2026 Aalo named cloud provider Crusoe as the partner for Project Ascension, its second, commercial-scale 10 MWe reactor on the Aalo-X campus: a 2027 proof-of-concept will pair a 50 MWe Aalo Pod with a Crusoe Spark modular data center at INL, with both companies targeting commercial nuclear-powered AI data center deployments by the end of 2029. Aalo says it is also preparing to submit its first commercial reactor license application (a combined construction and operating license) to the NRC in 2026, with a long-term target of 3 cents/kWh electricity.

GE Vernova Hitachi Nuclear Energy logo

GE Vernova Hitachi Nuclear Energy

Nuclear Fission

GE Vernova Hitachi Nuclear Energy (GVH, formerly GE Hitachi Nuclear Energy) is the Wilmington, North Carolina-based nuclear alliance formed by GE (60%, now GE Vernova) and Hitachi (40%) in 2007, combining reactor design, services for the global boiling-water-reactor fleet, and fuel manufacturing through Global Nuclear Fuel. Its flagship BWRX-300 small modular reactor - a 300 MWe natural-circulation design derived from the NRC-certified ESBWR - is the first grid-scale SMR under construction in the Western world, with Ontario Power Generation building the first of four units at Darlington for service by the end of 2030. In the US, TVA's Clinch River construction permit application cleared its NRC staff safety evaluation in June 2026, backed by a $400M DOE award, and in March 2026 the US and Japanese governments announced up to $40B to deploy up to 10 BWRX-300s (3 GW) in Tennessee and Alabama under the US–Japan strategic investment framework. The order book extends across Poland (ORLEN Synthos Green Energy, including a June 2026 agreement for up to six units at Włocławek), the UK (Generic Design Assessment completed December 2025; an SGE-led team bid in mid-2026 to build 14 units), a new US project with Elementl Power in Meigs County, Ohio (up to five units, agreed June 2026), Estonia (where parliament passed a comprehensive nuclear energy law in June 2026), Hungary, Saskatchewan, Lithuania (MOU signed February 2026) and Bulgaria (JV letter of intent signed December 2025), plus a March 2026 MOU with Hitachi to explore Southeast Asia. GVH lost Sweden's first new-nuclear competition in June 2026, when Vattenfall's Videberg Kraft venture picked Rolls-Royce SMR over the BWRX-300 for its Ringhals project. GVH also co-developed the Natrium sodium-cooled fast reactor with TerraPower, which began construction in Wyoming in 2026. Jason Cooper became President & CEO in January 2026. GE Vernova's Q2 2026 10-Q separately disclosed Nuclear Power segment revenue for the first time - $1,575M for H1 2026, up from $1,310M in H1 2025.

Holtec International logo

Holtec International

Nuclear Fission

Holtec International is a vertically integrated nuclear technology and services company whose core businesses include used-fuel storage and transport systems, plant decommissioning, manufacturing, and nuclear project execution. Its flagship growth program is the restart of the Palisades plant in Michigan, which would be the first U.S. nuclear plant to return from decommissioning to operations status: on August 30, 2026 Holtec began loading fuel into the 204-assembly reactor core, the most visible physical milestone yet, though extensive tests and inspections and a firm restart date still lie ahead. Its other flagship program is the SMR-300 small modular reactor platform, which Holtec is advancing at Palisades and in the UK with EDF. Holtec is also pursuing a large SMR-300 program in India - where a March 2025 U.S. DOE 10CFR810 authorization lets it share the design with partners Tata Consulting Engineers, Larsen & Toubro, and its Holtec Asia subsidiary - with a February 2026 plan to build up to 200 SMR-300s from an expanded manufacturing hub in Gujarat, and in Rwanda, where a May 2026 Comprehensive Development Agreement with the country's Atomic Energy Board targets up to roughly 5 GW of capacity, Holtec's first sub-Saharan African market. After a confidential filing in February 2026, Holtec publicly filed a Form S-1 on July 10, 2026 for a Nasdaq / Nasdaq Texas IPO under the ticker HNUC - the S-1 disclosing $989M of revenue for the 12 months ended March 31, 2026 - in an offering that Renaissance Capital estimates could raise about $2 billion (with press reporting on overall company valuation running as high as roughly $10 billion). An S-1/A amendment filed August 21, 2026 updated the offering's financials through the six months ended June 30, 2026, disclosing $269.9M of revenue (down from $286.6M in the first half of 2025) alongside higher gross operating profit of $118.5M (up from $78.8M); shares and price range remain unset as of August 31, 2026. Holtec's SMR-300 pipeline now spans Palisades, the Green River, Utah revival project, a newly cleared Oyster Creek, New Jersey site (NRC approved the plant's license termination plan on July 30, 2026, opening the way for four more SMR-300 units there), the Cottam, UK proposal with EDF, and Rwanda - and on August 4, 2026 Holtec signed a non-binding memorandum of agreement with Entergy and Hyundai Engineering & Construction to evaluate further SMR-300 projects across Entergy's Gulf South territory.

Kairos Power logo

Kairos Power

Nuclear Fission

Kairos Power is commercializing its fluoride salt-cooled, high-temperature reactor (KP-FHR), which combines TRISO pebble fuel with FLiBe coolant in a compact, low-pressure design. The company runs an iterative, vertically integrated development model centered on Hermes 1, a 35 MWth demonstration reactor under safety-related construction in Oak Ridge, and Hermes 2, an electricity-producing demonstration plant for the TVA grid. In April 2026 Kairos broke ground on Hermes 2 - the first deployment under its Google-backed fleet plan totaling up to 500 MWe by 2035 - while a May 2026 NRC amendment extended Hermes 1's construction-completion deadline to April 2029 (Kairos now expects to finish building the test reactor in 2028). Kairos operates two ISO 9001:2015-certified sites (Alameda and Albuquerque) as it scales toward serial reactor-hardware production, and Hermes 2 is targeted to deliver first grid power around 2030. The company is also building out its fuel and materials supply chain, including a February 2026 five-year, $27M partnership with Oak Ridge National Laboratory and being named the first customer for BWXT's $500M TRISO fuel plant in Wyoming, which in July 2026 laid out a phased schedule toward full commercial production by 2031. In August 2026 Kairos also launched NuCAMP, a 12-month manufacturing-methods and workforce-training partnership with Oak Ridge National Laboratory and regional universities and colleges at its Oak Ridge campus.

NuScale Power logo

NuScale Power

Nuclear Fission

NuScale Power is a public small modular reactor developer commercializing its NRC-approved 77 MWe NuScale Power Module through ENTRA1-led deployments. In 2025-26 it advanced a nonbinding program with TVA for up to 6 GW of NuScale capacity (with CEO John Hopkins still targeting a binding PPA by year-end 2026, with no definitive agreement as of the Q2 2026 earnings call), secured a Final Investment Decision for the Romanian RoPower project (though a July 2026 Romanian government control-body audit alleging schedule slippage and cost overruns at Doicești has become a political overhang, even as Nuclearelectrica shareholders voted to keep NuScale as the sole chosen technology), and launched a strategic petrochemical process-heat partnership with Ebara Elliott Energy. NuScale remains pre-deployment and ended Q2 2026 with about $1.9B in cash, cash equivalents and investments, up roughly $900M from Q1, on Q2 revenue of $75,000 and a net loss of $50.1M. 2026 work is centered on first-module manufacturing readiness - components for 12 modules are in production - fuel supply, and converting its development pipeline into binding projects. In late August 2026 NuScale announced a strategic alliance with Nuclearn and NPX to deploy nuclear-specific AI tools across its engineering and licensing workflows (an early proof of concept cut information-search time by up to 80%), while RBC Capital cut its price target on the stock to $10 from $14 citing the still-unsigned TVA agreement.