Palantir Technologies logo

Palantir Technologies

Public (NASDAQ: PLTR)Founded 2003🇺🇸Miami, Florida
CEO

Alex Karp

Data verified as of Sep 4, 2026

Summary

Palantir Technologies builds data-integration and AI software platforms - Gotham for defense and intelligence, Foundry for enterprises and civil government, AIP for deploying large language models on private networks, and Apollo for continuous software delivery into classified and air-gapped environments. Founded in 2003 by Peter Thiel, Alex Karp and others with early CIA backing via In-Q-Tel, the company relocated its headquarters from Denver to Miami in February 2026. It is now the leading software prime contractor in US defense: its Maven Smart System AI targeting platform became a formal Pentagon program of record in August 2026 (ahead of a September 30 deadline), carries a ~$1.3 billion contract ceiling through 2029, and is the subject of a Pentagon FY2027 budget request of $2.3 billion over five years to expand it and a related Joint Fires Network; the Army signed an enterprise agreement worth up to $10 billion over ten years in July 2025; Foundry contributes to the Army's Next Generation Command and Control (NGC2) common data layer baseline alongside Anduril's Lattice (with Anduril as lead integrator), validated at division scale during the July 2026 Project Convergence-Capstone 6 exercise; and Palantir is teamed with Anduril on command-and-control software for the $185 billion Golden Dome missile shield, which passed its first publicly disclosed tests in mid-2026. Allied business is growing too, with NATO acquiring Maven in 2025 and the UK signing a strategic partnership under which Palantir will invest £1.5 billion and base its European headquarters in Britain. The commercial business, supercharged by AIP since 2023, is growing even faster than government: US commercial revenue rose 149% year-over-year in Q2 2026. Financially the company is in hypergrowth - FY2025 revenue was $4.475 billion (up 56%) with $1.625 billion in GAAP net income, Q2 2026 revenue hit a record $1.94 billion (up 93%), and 2026 guidance was raised to $8.150-8.158 billion (82% growth) with Q3 2026 guidance of $2.160-2.164 billion (report expected around November 9, 2026). It serves 1,049 customers and holds $9.2 billion in cash and treasuries with no debt. The stock remains one of the market's most richly valued, having rallied roughly 40% over the month following the Q2 beat to around a $447 billion market cap (Aug 27, 2026). Headwinds include intensifying European data-sovereignty pushback - France's internal-intelligence service moved in June 2026 to drop Palantir for French rival ChapsVision, Germany's Bundeswehr formally excluded Palantir from a planned military cloud/AI project in April 2026 in favor of three European rivals, and in July 2026 France and Germany signed a joint declaration to build a 'European sovereign digital backbone' as an alternative to Palantir's military software, pitching France's Arcadia platform to replace the Maven Smart System - alongside long-running civil-liberties criticism of its ICE and policing work. On September 3, 2026 Palantir and PwC US announced an expanded strategic alliance to scale enterprise AI, initially focused on enterprise AI deployment, M&A transformation and ERP modernization, including an AI-native deals platform the companies say can execute transactions up to 50% faster while cutting one-time transaction costs up to 45%.

Company OverviewRead the long-form profile of Palantir Technologies

/ Recent News

View all →
  • View all news

    Browse the daily archive

Main Products

Gotham / Maven Smart System

Palantir's defense and intelligence operating system, released in 2008, fuses satellite imagery, signals, and intelligence sources so analysts and commanders can find targets and run operations. Its AI evolution, the Maven Smart System, compresses sensor-to-shooter timelines from hours to minutes and is used across US combatant commands, the Army, Marine Corps, and NATO.

Deployed across US combatant commands and NATO; Maven Smart System became a formal Pentagon program of record in late August 2026, ahead of the FY2026 (Sept 30) deadline

Maven active users / builders20,000+ users across 35+ military tools (May 2025); 25,000+ active builders and on track for ~$1B annualized revenue run rate per William Blair (Aug 2026)
Maven contract ceiling~$1.3B through 2029; Pentagon FY2027 budget separately requests $2.3B over five years for Maven and the related Joint Fires Network
Foundry

Foundry

Operational

Palantir's data-integration platform for enterprises and civil government, released in 2016, turns an organization's data into an integrated 'ontology' that operational applications are built on. It underpins the UK NHS Federated Data Platform and contributes to the US Army's Next Generation Command and Control (NGC2) common data layer baseline established in June 2026, alongside Anduril's Lattice, with Anduril as lead integrator.

Core commercial platform; contributes to the Army NGC2 data-layer baseline as of June 2026 alongside Anduril's Lattice

NGC2 roleContributes Foundry to the Army's NGC2 common data layer baseline (June 2026) as part of an edge-to-cloud data mesh alongside Anduril's Lattice; Anduril leads the baseline and the 4th Infantry Division full-stack rollout, validated at division scale during the July 20-29, 2026 Project Convergence-Capstone 6 exercise at Fort Irwin, California
NHS Federated Data Platform£330M, 7-year contract (2023)
AIP (Artificial Intelligence Platform)

Launched in April 2023, AIP lets organizations run large language models and AI agents against their own data on private, secure networks, with hands-on 'bootcamps' taking customers from zero to a working use case in days. AIP is the primary driver of Palantir's triple-digit US commercial growth and now hosts NVIDIA Nemotron open models for sovereign government deployments.

Fastest-growing offering; extended to sovereign/air-gapped NVIDIA Nemotron deployments in June 2026

US commercial revenue (Q2 2026)$764M, +149% YoY
US commercial remaining deal value$6.24B (Q2 2026, more than doubled YoY)
Apollo

Apollo

Operational

Palantir's continuous-delivery and deployment platform, which autonomously ships and updates software across cloud, on-premise, classified, and air-gapped environments. Apollo is what lets Palantir operate SaaS-style inside secure government networks, and it anchors the company's sovereign AI stack, including the June 2026 engine for deploying NVIDIA Nemotron models in sovereign environments.

Delivery backbone for all Palantir platforms, including classified and air-gapped networks

Sovereign AI roleDeploys NVIDIA Nemotron open models in air-gapped/sovereign environments (June 2026)

What's Next

Deliver first TITAN production ground stations

Following the September 1, 2026 $192 million TITAN production awards, Palantir as prime is to deliver eight AI-enabled ground stations (four Advanced and four Basic) within 18 months, with additional Army production awards expected in fiscal 2027.

Early 2028

Defend government/defense AI turf against Google's Fairwind push

Google DeepMind's September 2, 2026 launch of Gemini 3.8 Flash Cyber and its Fairwind Program - which gives vetted governments, critical-infrastructure operators and defenders early access to an autonomous vulnerability-discovery and patching model - was read by investors as a direct move into Palantir's core government AI territory, and contributed to a 7% drop in Palantir shares the same day even as the company had just landed the TITAN production award and hired AIG's Peter Zaffino as global head of financial services. How much of Fairwind's government/critical-infrastructure customer base overlaps with Palantir's Gotham/Maven accounts is not yet clear.

Ongoing

Q3 2026 earnings report

Palantir's next quarterly report is expected around November 9, 2026, having guided Q3 2026 revenue of $2.160-2.164 billion and adjusted income from operations of $1.292-1.296 billion. Investors will watch whether US commercial growth holds near triple digits and whether the raised FY2026 guidance is met or exceeded again.

November 9, 2026

Deliver on raised FY2026 guidance of $8.15-8.16B revenue (+82%)

After 85% growth in Q1 and a record 93% in Q2, Palantir raised full-year 2026 guidance to $8.150-8.158 billion in revenue (82% growth), over $3.424 billion of US commercial revenue (+134%), and $4.5-4.7 billion of adjusted free cash flow. Delivering on this would nearly double the FY2025 top line and is the central test of whether its AI-driven acceleration, now reinforced by Maven's program-of-record status, is durable.

2026

NGC2 full-stack fielding to first two Army divisions

The Army's FY2027 budget request ($3.78 billion for NGC2) funds fielding the full NGC2 stack to two divisions in FY2027, following operational validation at the 4th Infantry Division (including the July 20-29, 2026 Project Convergence-Capstone 6 exercise at Fort Irwin) and the 25th Infantry Division, with three more division equivalents procured for FY2028. In June 2026 the Army named Anduril as lead integrator for the NGC2 common data layer baseline, with Palantir's Foundry contributing the edge-to-cloud data mesh alongside Anduril's Lattice - Anduril leads the full-stack rollout at 4th ID and Lockheed Martin leads at 25th ID. The Army wants all 11 divisions equipped within five years, a multi-year revenue runway for Palantir even as its data-layer role sits within a broader multi-vendor stack rather than as sole platform.

2027

Golden Dome: further C2 testing toward 2028 initial operational capability

Following the successful mid-2026 command-and-control tests, the Golden Dome missile shield's Anduril-Palantir software backbone faces further validation ahead of the program's targeted initial operational capability in summer 2028, alongside separately planned space-based-interceptor flight demonstrations in 2027. Program funding remains a watch item: reporting in August 2026 flagged uncertainty over full multi-year funding even as the software track advances on schedule.

Summer 2028

Congress to fund $2.3B FY2027 Maven / Joint Fires Network expansion

Now that Maven Smart System is a formal program of record, its funding runs through the normal defense budget cycle rather than ad hoc contract actions. The Pentagon's FY2027 budget request asks Congress for $2.3 billion over five years to expand Maven and a related Joint Fires Network connecting battlefield intelligence directly to weapons systems - the first time Maven has been framed as a core, rather than experimental, budget line.

FY2027

Japan evaluates Maven Smart System for Self-Defense Force command and control

Japan's Defense Ministry is reported to be weighing Palantir's Maven Smart System, alongside Anduril's Lattice AI, for Self-Defense Force command and control, aiming to speed decision-making and improve interoperability with US forces while trying to avoid long-term dependence on foreign technology via a proposed Japanese Sakana AI-based command layer (Sakana Fugu). Multiple reports through late August 2026 confirm the matter remains at the consideration stage, with Japan planning to rewrite national security documents in 2026 to address AI in command-and-control decision support, but with no final procurement decision or timeline announced.

Unspecified

Track Record

3 of 3 announced dates hit

Maven Smart System becomes a formal DoD program of record

Target Q3 2026 · Resolved Aug 25, 2026

The Pentagon completed Maven Smart System's transition into a formal program of record in late August 2026, ahead of the September 30 fiscal year-end deadline set by Deputy Secretary of War Steve Feinberg's March 2026 directive. The designation moves Maven onto structured, multi-year defense budget funding under Chief Digital and Artificial Intelligence Office oversight, with future contracting managed through the Army's enterprise agreement.

Hit

Golden Dome C2 software ready for testing

Target Summer 2026 · Resolved Aug 11, 2026

Golden Dome program director Gen. Michael Guetlein disclosed that the missile shield's command-and-control software, including the Anduril-Palantir 'glue layer,' completed its first large-scale tests on schedule, including one at White Sands Missile Range in June 2026, calling the results 'phenomenally successful.' Defense Secretary Pete Hegseth separately called one test a 'full mission success.'

Hit

Q2 2026 earnings report

Target August 3, 2026 · Resolved Aug 3, 2026

Palantir reported record Q2 2026 revenue of $1.94B (+93% YoY), beating consensus ($1.81B) with EPS of $0.41 vs. $0.35 estimated. US commercial revenue grew 149% YoY to $764M and US government revenue grew 90% YoY to $809M. The company raised FY2026 revenue guidance to $8.150-8.158B (82% growth) and issued Q3 2026 guidance of $2.160-2.164B.

Hit

Operations & Revenue

StatusProfitable hypergrowth

Palantir has been GAAP-profitable every quarter since Q1 2023 and posted $1.625 billion in GAAP net income on $4.475 billion of revenue in FY2025. In Q2 2026 revenue grew 93% year-over-year to a record $1.94 billion, with EPS of $0.41 (vs. $0.35 estimated) and US commercial revenue up 149% to $764 million; the company closed 220 deals worth $1M+ in the quarter and posted a Rule of 40 score of 155%. The company raised full-year 2026 revenue guidance to $8.150-8.158 billion (82% growth) and issued Q3 2026 guidance of $2.160-2.164 billion, ending the quarter with $9.2 billion in cash and short-term Treasuries and no debt. The stock has since rallied roughly 40% to a market cap near $447 billion, helped by the Maven Smart System's transition to a formal Pentagon program of record in late August 2026 (with analysts flagging Maven on track for a $1 billion annualized revenue run rate) and disclosed successful command-and-control tests for the Golden Dome missile shield. Growth is led by US government AI programs (Maven, NGC2, the Army enterprise agreement) and AIP-driven US commercial adoption, while European sovereignty pushback has deepened beyond France's DGSI switch: Germany's Bundeswehr formally excluded Palantir from its planned military cloud/AI infrastructure project in April 2026, shortlisting three European rivals (Almato, Orcrist, Chapsvision) instead.

Revenue Streams

US government software

Software licenses and services for defense, intelligence, and civil agencies - Gotham, the Maven Smart System (~$1.3B ceiling through 2029), TITAN ground stations, the NGC2 data layer, and the Army's up-to-$10B Enterprise Service Agreement. US government revenue was $1.855B in FY2025 (+55%) and grew 84% year-over-year in Q1 2026.

US commercial (AIP + Foundry)

Enterprise subscriptions to Foundry and AIP, sold increasingly through short 'bootcamp' engagements that convert into large contracts. US commercial revenue was $1.465B in FY2025 (+109%) and reached $764M in Q2 2026 (+149% YoY), with $6.24B of remaining deal value (more than doubled YoY) and a record $2.13B of US commercial total contract value closed in the quarter - the company's fastest-growing segment.

International government & allied defense

Contracts with allied governments including NATO's Maven Smart System acquisition (March 2025), the UK MoD's £240.6M three-year contract signed December 2025 plus the £330M NHS Federated Data Platform, and deployments supporting Ukraine. International business (UK ~$427M plus rest-of-world ~$728M in 2025) accounts for roughly a quarter of revenue. European sovereignty pushback is a growing headwind: France's DGSI dropped Palantir for ChapsVision in 2026, and Germany's Bundeswehr formally excluded Palantir from a planned military cloud/AI project in April 2026, shortlisting three European alternatives.

Key Metrics

Employees

4,429 (as of December 31, 2025)

Est. Annual Revenue

FY2025: $4.475B actual (+56%); FY2026 guidance raised to $8.150-8.158B (~82% growth) after Q2's 93% YoY growth; Q3 2026 guidance of $2.160-2.164B revenue issued Aug 3, 2026, with the report expected around November 9, 2026

Market cap

~$447B (Aug 27, 2026), up ~40% over the prior month on the Q2 beat plus Maven's program-of-record designation

FY2025 revenue

$4.475B (+56% YoY)

Q2 2026 revenue

$1.94B (+93% YoY, record growth), EPS $0.41 vs. $0.35 est.

US government revenue (Q2 2026)

$809M (+90% YoY)

US commercial revenue (Q2 2026)

$764M (+149% YoY)

Customers

1,049 (Jun 30, 2026, +24% YoY); 653 US commercial customers (+35% YoY) - latest disclosed figure; Q3 2026 results not yet reported

Employees

4,429 (Dec 31, 2025) - latest officially disclosed figure; Palantir does not report headcount in quarterly filings

Cash & short-term treasuries

$9.2B (Jun 30, 2026), no debt

Timeline

2026Record results; headquarters moves to Miami

Palantir reported FY2025 revenue of $4.475 billion (up 56%) with $1.625 billion GAAP net income on February 2, 2026, then abruptly announced on February 17 that it was moving its headquarters from Denver to Miami. Q1 2026 revenue accelerated to 85% growth - the company's highest ever - prompting raised full-year guidance of ~$7.65 billion.

2026Golden Dome software team and NGC2 data layer

In March 2026 the Wall Street Journal reported that an Anduril-Palantir consortium is building the command-and-control software 'glue layer' for the $185 billion Golden Dome missile shield. In June 2026 the Army established the NGC2 common data layer baseline with Palantir Foundry as its cloud data platform, and Palantir launched an engine for deploying NVIDIA Nemotron models in sovereign, air-gapped environments.

2026USDA food-supply-chain contract

In April 2026 Palantir signed a $300 million contract with the US Department of Agriculture to build software tracking and safeguarding the US food supply chain, extending the company's civil-government footprint beyond defense and intelligence customers.

2026Germany's Bundeswehr excludes Palantir from military cloud project

On April 28, 2026 Vice Admiral Thomas Daum, the Bundeswehr's cyber and information domain inspector, confirms Germany's armed forces will not select Palantir for a planned military cloud and AI infrastructure project, citing data-sovereignty concerns about foreign-vendor personnel access to national datasets. Three European alternatives are shortlisted instead - Almato (Stuttgart), Orcrist (Berlin), and Chapsvision (Paris, the same firm that replaced Palantir at France's DGSI) - with evaluation through summer 2026 and a contract award targeted by year-end.

2026Q2 2026 results: revenue up 93%, guidance raised again

Palantir reported Q2 2026 revenue of $1.935 billion on August 3, up 93% year over year, with GAAP diluted EPS of $0.41 and US commercial revenue up 149% to $764 million. The company raised full-year 2026 revenue guidance to $8.15-8.16 billion (82% growth) and adjusted free cash flow guidance to $4.50-4.70 billion.

2026Mercury Systems defense-manufacturing partnership

On August 3, 2026 Mercury Systems announced a strategic agreement with Palantir to automate material planning and factory operations across its U.S. defense-manufacturing sites, building an enterprise ontology on Foundry as a digital twin of Mercury's production footprint. The effort, sponsored under a U.S. government Tradewind Prototype Agreement, targets reduced manual workloads and more predictable output without extending delivery timelines or raising costs.

2026Pentagon drafts directive for $244M no-bid contract

Deputy Defense Secretary Stephen Feinberg signs an August 4, 2026 memo, made public August 11, directing Pentagon acquisition and comptroller officials to spend up to $243.9 million on Palantir services through March 31, 2027 without competitive bidding, with additional funding pathways contemplated through December 2028. The memo does not specify how the money will be used, drawing criticism from transparency advocates over the lack of competitive bidding.

2026Pentagon appoints Maven Smart System program director

On August 5, 2026 Pentagon leadership appointed Army Col. Molly Solsbury as Maven Smart System program director inside the Chief Digital and Artificial Intelligence Office (CDAO), anchoring a dedicated team to drive the platform's transition into a formal program of record ahead of the September 30, 2026 fiscal year-end deadline.

2026Golden Dome command-and-control software passes first disclosed tests

Golden Dome program director Gen. Michael Guetlein disclosed in mid-August 2026 that the missile-shield's command-and-control software, including the Anduril-Palantir 'glue layer,' had completed its first large-scale tests, including one at White Sands Missile Range in June 2026, calling them 'phenomenally successful.' Defense Secretary Pete Hegseth separately called one test a 'full mission success.' The tests validated the C2, sensor-network, and effector integration ahead of the program's targeted 2028 initial operational capability.

2026Maven Smart System becomes an official Pentagon program of record

Following Deputy Secretary of War Steve Feinberg's March 9, 2026 directive and the August 5 appointment of a dedicated program director, the Pentagon completed Maven Smart System's transition into a formal program of record in late August 2026, ahead of the September 30 fiscal year-end deadline. The designation moves Maven from year-to-year contract funding into the structured defense budget cycle, with oversight held by the Chief Digital and Artificial Intelligence Office and future contracting managed through the Army's enterprise agreement; the Pentagon's FY2027 budget separately requests $2.3 billion over five years to expand Maven and a related Joint Fires Network.

2026Army awards $127M TITAN production for eight ground stations

On September 1, 2026 the U.S. Army issued TITAN production delivery orders totaling $192 million, moving the AI-enabled Tactical Intelligence Targeting Access Node from prototype into production. Palantir, as prime, received about $127 million for eight systems (four Advanced and four Basic) plus software and fielding, with first delivery inside 18 months. Anduril received about $65 million for ruggedized vehicle-mounted hardware and shelter integration. The Army said it expects additional production awards in fiscal 2027.

2025NATO acquires Maven Smart System

On March 25, 2025, NATO's Communications and Information Agency finalized acquisition of Maven Smart System NATO for Allied Command Operations - one of the fastest procurements in alliance history at six months from requirement to award. Two months later the Pentagon raised Palantir's Maven contract ceiling from $480 million to ~$1.3 billion through 2029.

2025Army signs enterprise agreement worth up to $10 billion

On July 31, 2025, the US Army consolidated 75 separate contracts into a single ten-year Enterprise Service Agreement with Palantir capped at $10 billion, streamlining how the service buys Palantir software. Days earlier, the Anduril-Palantir team won a $100 million prototype award for the Army's Next Generation Command and Control (NGC2) program.

2025UK strategic partnership and £1.5 billion investment

In September 2025 Palantir and the UK government announced a strategic defense partnership under which Palantir will invest £1.5 billion (~$2 billion) in the UK and base its European headquarters in Britain. The Ministry of Defence followed with a directly awarded £240.6 million three-year contract signed December 30, 2025.

2024TITAN prime contract - a software company builds Army hardware

In March 2024 the Army awarded Palantir a $178 million contract to build 10 TITAN (Tactical Intelligence Targeting Access Node) AI-enabled ground stations, the first time a software company served as prime contractor on a major Army hardware program. Palantir also won the $480 million Maven Smart System contract that May.

2024Joins the S&P 500

S&P Dow Jones Indices added Palantir to the S&P 500 effective September 23, 2024, replacing American Airlines; the stock jumped 14% on the news. In November 2024 Palantir moved its listing from the NYSE to the Nasdaq Global Select Market.

2023AIP launch rides the AI wave

Palantir launched its Artificial Intelligence Platform (AIP) in April 2023, integrating large language models into customers' private networks, and pioneered hands-on 'bootcamps' to compress sales cycles. AIP became the engine of triple-digit US commercial growth. The company also posted its first GAAP-profitable quarter in Q1 2023.

2020Direct listing on NYSE

Palantir went public via direct listing on September 30, 2020, opening at $10 against a $7.25 reference price - roughly a $22 billion opening valuation. It also moved its headquarters from Palo Alto to Denver that year.

2019Takes over Project Maven

After Google withdrew from the Pentagon's Project Maven AI program under employee pressure, Palantir took over the drone-imagery analysis work. Maven became the foundation of Palantir's flagship military AI offering, the Maven Smart System.

2016Palantir Foundry released

Palantir released its second platform, Foundry, to address data-integration challenges at large companies, opening a commercial business beyond government. The same year it partnered with Airbus (later the Skywise platform) and won a landmark lawsuit against the US Army over software procurement practices.

2008Palantir Gotham released

Palantir released its first platform, Gotham, built for analysts at defense and intelligence agencies hunting for 'needles in thousands of haystacks.' That year US Army special operations commanders deployed it in the field, beginning Palantir's long relationship with the military.

2005In-Q-Tel backing and CIA adoption

The CIA's venture arm In-Q-Tel invested roughly $2 million, alongside ~$30 million bankrolled largely by Thiel and Founders Fund. Intelligence-community analysts became the company's first users, shaping the software that would become Gotham.

2003Founded

Peter Thiel, Alex Karp, Stephen Cohen, Joe Lonsdale, and Nathan Gettings found Palantir, named after the 'seeing stones' of Tolkien's legendarium. The founding vision was to adapt PayPal-style fraud-detection techniques to counter-terrorism while preserving civil liberties.

Funding

Cumulative disclosed raise · dated rounds

$500M$1B$1.5B200420072010201320162019$1.4B raised
RoundDateAmountInvestorsSource
Early venture (incl. In-Q-Tel)2004–2005~$32MPeter Thiel, Founders Fund, In-Q-Tel (~$2M)
Series AJun 2006$7.5MVenture investors incl. existing backers
Growth roundDec 2013$450MPrivate investors at ~$9B valuation
Late-stage growthDec 2015$880MPrivate investors at $20B valuation
Direct listing (NYSE)Sep 2020No new capital raised (reference price $7.25; opened at $10)Public markets

/ Related Companies

All Defense Tech
Airbus logo

Airbus

Defense Tech

Airbus is Europe's largest aerospace company, spanning commercial aircraft, helicopters, defence and space. In civil aviation it remains Boeing's only true peer at global scale and is pairing near-term production growth with longer-term work on lower-carbon aircraft technologies, future single-aisle designs and hydrogen propulsion. The company combines a mature global airliner business with broader aerospace capabilities across defence, space and rotorcraft. Q1 2026 was unusually weak - 114 deliveries (vs. 136 a year earlier), revenue down 7% to EUR 12.65B and adjusted EBIT halved to EUR 300M due to Pratt & Whitney engine shortages and Chinese delivery disruptions - but Airbus reaffirmed full-year 2026 guidance of ~870 deliveries, EUR 7.5B adjusted EBIT and EUR 4.5B free cash flow, with a record commercial backlog above 9,000 aircraft. Output recovered strongly through mid-year: official figures reported July 10 showed 351 deliveries in H1 2026 (up ~15% YoY), Airbus's best first half since 2019, and the backlog stood at 9,216 aircraft at end-June. At a measured Farnborough Airshow (July 20-24, 2026) Airbus booked roughly 157 firm commercial orders plus commitments (of a show-wide $84.7B / 353 firm aircraft), headlined by SMBC Aviation Capital's 100 A320neo-family jets, VietJet's 20 A330neos (~$7.4B), and new A350-1000 orders from Riyadh Air and Philippine Airlines, with CEO Guillaume Faury reaffirming the ~870-delivery full-year target. On July 26 Airbus announced a EUR 5B share buyback and raised medium-term targets, and on July 29 it reported H1 2026 results: revenue up 12% YoY to EUR 33.2B on 351 deliveries, powered by a record Q2 (237 deliveries, +39% YoY). Airbus's official July tally, published August 7, showed the delivery pace cooling further to 67 aircraft (39 customers) and 204 gross orders, taking YTD deliveries to 418 versus 373 at the same point in 2025 - still 51 aircraft ahead of Boeing (367 YTD) but below the roughly 85-90/month cadence needed to reach the 870-aircraft target. August's official tally showed a further cooldown to 47 aircraft delivered to 31 customers and 46 gross orders (including airBaltic firming 10 more A220-300s), taking YTD deliveries to 465 - now requiring an average of roughly 100 aircraft a month over the final four months of the year to hit the 870-aircraft guidance. Part of the August softness traces to a production quality issue on the A330neo: Airbus found a stray tool and other quality lapses on the horizontal tail plane (assembled at its Getafe plant) that nearly halted A330neo deliveries for three months - zero handed over in June and July, just one in August, to Starlux Airlines - before Airbus said in early September the root cause was identified, the issue was isolated and unrelated to the Spain labor dispute, and deliveries had resumed. Two other supply and schedule risks continue to shadow the ramp: Airbus's dispute with Pratt & Whitney over shorted A320neo engine deliveries has hardened into a formal damages claim that could go to arbitration, and the A350F freighter has now penciled in a tentative first-flight date around September 24, 2026 (reports August 19-20), with first delivery still targeted for the second half of 2027 - a tight but so-far-unrevised schedule given typical 12-15 month flight-test campaigns. Airbus also confirmed two divisional leadership changes already in effect this year (Lars Wagner as Commercial Aircraft CEO since January, Matthieu Louvot as Airbus Helicopters CEO since April) and a board chair transition, with Amparo Moraleda succeeding Rene Obermann on October 1, 2026. Thousands of Airbus workers in Spain resumed an indefinite strike the week of August 24 after rejecting a pay offer; on August 31 workers voted 81% to keep striking rather than suspend it, and on September 1 SIMA-mediated talks with the three unions leading the walkout (CGT, UGT, UTIL) broke down without agreement, so Airbus shifted to a parallel negotiating track with non-striking unions (CCOO, SIPA, ATP) while the indefinite strike, and its drag on production, continued into early September with no resolution yet. On the defense side, Airbus also picked up two notable wins in mid-to-late August: a $115 million U.S. Army contract (option for two more) for 10 UH-72B Lakota helicopters announced August 14, and a EUR 5.4 billion (~$6.3B) Spain-Poland framework agreement approved by Spain's Council of Ministers on August 25 for the joint procurement of seven A330 MRTT tankers (three for Spain, four for Poland) under the EU's SAFE instrument, to be assembled at Airbus's Getafe site with Polish deliveries targeted by 2030 and definitive contracts still to be negotiated. Airbus's stock has held up despite the noise, with a market cap of roughly $190B in mid-August 2026. Separately, on August 29, 2026 the Financial Times reported that Airbus is reviewing its US small-satellite manufacturing business at Merritt Island, Florida (more than 200 staff and several hundred million dollars in annual revenue), with a sale among the options; Airbus confirmed the review and said it is separate from its planned European space combination with Leonardo and Thales.

Amazon Leo logo

Amazon Leo

Defense Tech

Amazon Leo - Amazon's satellite division, launched as Project Kuiper in 2019 and rebranded November 13, 2025 - is a low Earth orbit broadband network for customers and communities beyond the reach of existing terrestrial infrastructure. Led by VP Rajeev Badyal from Redmond, Washington, it combines thousands of satellites built at a Kirkland factory (up to five per day), a global ground network integrated with AWS, and a three-terminal hardware lineup: Leo Nano, Leo Pro, and Leo Ultra. The enterprise beta went live April 8, 2026 with partners including Verizon, AT&T, Vodafone, JetBlue, and NASA; after ULA's final Atlas V flight (LA-08) on July 2, 2026, about 396 production satellites are in orbit and Amazon says it has enough capacity to open commercial service in late 2026. The FCC granted a waiver June 5, 2026 for missing the July 30 50%-deployment milestone (1,618 of 3,236 satellites), imposing a temporary spectrum-priority reduction on post-July-30 satellites until March 2028. The $11.57B Globalstar acquisition (expected to close 2027) adds direct-to-device capability, Delta signed for a 500-aircraft Wi-Fi rollout beginning 2028, and a July 2026 deal makes South Africa's Herotel the first African ISP to distribute Leo residential service ('evry, powered by Amazon Leo', launching 2027).

Anduril Industries logo

Anduril Industries

Defense Tech

Anduril Industries is an American defense technology company founded in 2017 by Oculus creator Palmer Luckey with Palantir veterans Brian Schimpf (CEO), Trae Stephens, Matt Grimm, and Joe Chen. Its core thesis is to build software-defined, mass-producible autonomous weapons around Lattice, an AI command-and-control platform that fuses sensor data and orchestrates fleets of unmanned systems. Its hardware now spans every domain: the Fury (FQ-44A) collaborative combat aircraft, Ghost and Bolt drones, Altius loitering munitions, Roadrunner reusable jet interceptors, Barracuda cruise missiles, Ghost Shark autonomous submarines, a new class of autonomous surface vessels built with South Korea's HD Hyundai, and the EagleEye mixed-reality soldier headset built with Meta. Anduril holds prime positions on several of the Pentagon's most-watched programs: the Air Force ordered its FQ-44A into production in June 2026 alongside General Atomics' FQ-42A, targeting at least 150 CCAs by the end of the decade, with a mission-autonomy software down-select still to come; it took over Microsoft's $22B IVAS soldier-headset program in 2025 (now SBMC) and is running a second prototype cycle after its Phase 2 hardware redesign, with an Army downselect and production decision potentially landing in fiscal 2028; it won a 10-year, $20B Army enterprise agreement for Lattice-based counter-drone command and control in March 2026; in August 2026 it demonstrated a Lattice-powered Battle Manager for the Guam Defense System at Exercise Valiant Shield, fusing Army, Air Force, Navy and Missile Defense Agency assets; and it leads an industry team prototyping Golden Dome space-based interceptors, which cleared the program's first design-review gate in August 2026. In August 2026 the Department of Homeland Security also awarded Anduril a Track 2 slot on a $1.5B, five-year counter-UAS IDIQ, though Anduril protested its exclusion from the Track 1 hardware award, with a GAO ruling due by November 20, 2026. International business is scaling too, led by Australia's A$1.7B Ghost Shark program, completed Altius-600M deliveries to Taiwan plus an August 2026 NT$26.9 billion (~$847 million) letter of offer and acceptance for 2,032 more Altius systems (1,554 Altius-700M loitering munitions and 478 Altius-600ISR, first deliveries in Q4 2026), a State Department-approved (not yet finalized) possible $1.98B Kuwait counter-drone Foreign Military Sale, and a July 2026 agreement for Poland's state defense group PGZ to build the surface-launched Barracuda-500M cruise missile locally - Anduril's first European production site - alongside an Embraer MoU to launch palletized Barracuda-500Ms from the C-390. Manufacturing is anchored by Arsenal-1, a $1B, 5-million-square-foot Ohio factory where the first Ohio-built Fury rolled off the line on July 27, 2026, months ahead of schedule, with Roadrunner, Barracuda, and a classified platform slated to join the line by year-end. Revenue roughly doubled in 2025 to $2.2B (2026 guidance points to roughly $4.3B), and the company raised a $5B Series H at a $61B valuation in May 2026, bringing total funding above $11B; reports since late July 2026 of a further round at roughly a $100B valuation remain unconfirmed and had not closed as of August 26, 2026. With around 7,000 employees, Anduril is the most richly valued private defense-tech company; CEO Brian Schimpf said in July 2026 the company is in no rush to IPO.

Archer Aviation logo

Archer Aviation

Defense Tech

Archer Aviation is an electric aircraft company building Midnight, a piloted four-passenger eVTOL for short urban trips, while expanding into defense, powertrain sales, and aviation software. As of Q1 2026 Archer had passed 700 Midnight test flights, completed 70% of for-credit FAA flight-test points, and formally closed FAA Phase 3 in April 2026 - the first eVTOL company to do so - unlocking Type Inspection Authorization (TIA) and entering Phase 4 (formal compliance testing). In the UAE, the GCAA transitioned Midnight to a Restricted Type Certificate (RTC) program on May 7, 2026, targeting initial commercial certification as early as Q3 2026 - meaning Abu Dhabi is likely to see the first Midnight passenger flights before the U.S. The critical remaining FAA milestone is a publicly demonstrated piloted transition flight (VTOL→forward-flight mode), which is slated for H2 2026 and had still not been publicly demonstrated as of August 30, 2026. U.S. operations are targeted for H2 2026 in Florida, New York, and Texas under the eIPP. Archer is also the named official air taxi provider of the 2028 LA Olympics. On July 15, 2026, Archer unveiled Zee, an aviation-specific AI foundation model trained on ADS-B, air-traffic, and flight data, extending its ambitions beyond air taxis into aviation software. On July 20, 2026 at the Farnborough Airshow, Archer and Anduril unveiled a jointly-developed autonomous, series hybrid-electric tilt-rotor VTOL platform - a defense variant, Anduril's Group 5 'Thunder' attack rotorcraft, and Archer's commercial 'Halo' variant - sending Archer shares up about 20%. On August 3, 2026, Korean Air - which agreed in October 2025 to become Archer's exclusive commercialization partner in South Korea for up to 100 Midnight aircraft - said it will lead conversion and systems integration of a militarized Midnight variant for South Korea's Advanced Air Mobility defense program, extending Archer's defense ambitions into an international export partnership. On August 10, 2026 Archer reported Q2 2026 revenue of $5M (up 213% sequentially, beating estimates) but a wider-than-expected GAAP loss of $0.34/share on a one-time litigation settlement; Adjusted EBITDA loss was $177M and total liquidity fell to about $1.6B, and the company held Q3 2026 Adjusted EBITDA guidance at a loss of $170-200M. Archer also disclosed that during the quarter the FAA approved its quality management system, enabling FAA-creditable conformity findings across the aircraft, its components, and systems - Archer says this makes it the only eVTOL OEM in Phase 4 of type certification with an accepted means of compliance, on top of more than 150 piloted Midnight test flights completed (some exceeding 50 miles). The same day, Archer announced a deal to acquire Boeing's Wisk Aero, Insitu and SkyGrid businesses in exchange for a Boeing equity stake of up to 19.75%, a transaction still subject to Hart-Scott-Rodino antitrust review and expected to close by year-end 2026.

AST SpaceMobile logo

AST SpaceMobile

Defense Tech

AST SpaceMobile is building a direct-to-cell satellite network designed to connect standard smartphones to space-based 4G and 5G service without special hardware. After proving the concept with BlueWalker 3 and launching BlueBird 1-6, the company reached 13 satellites in orbit on August 5, 2026 with the successful launch of BlueBird 11, 12 and 13, following the June 17, 2026 launch of BlueBird 8, 9 and 10. The company counts nearly 60 mobile-network-operator partners covering more than 3 billion subscribers and reported its first meaningful revenue from gateway deliveries, MNO milestones, and government work. In April 2026 the FCC granted AST commercial Supplemental Coverage from Space authority for a constellation of up to 248 satellites - its first U.S. operating license for direct-to-device service - and on August 4, 2026 AST told the FCC it had begun its first commercial service outside the US, direct-to-cell in Japan with Rakuten Mobile. BlueBird 7 was lost after an April 2026 New Glenn upper-stage issue, and on July 15, 2026 AST pushed continuous US commercial service from late 2026 to early 2027 as launch-vehicle disruptions thinned its near-term access to orbit; the company has since ramped manufacturing to as many as six fully equipped satellites per month across two Midland, Texas sites, and in early August 2026 Guinness World Records recognized its Block 2 phased array as the largest commercial communications array ever deployed in low Earth orbit. On August 6, 2026 AST said it had expanded network integration testing, subject to regulatory approvals, across eight European countries with Vodafone, Orange, Telefonica, Deutsche Telekom and Vodafone Ukraine, using the carrier-neutral ground infrastructure of Satellite Connect Europe, its Luxembourg-based joint venture with Vodafone. At its August 10, 2026 Q2 business update, AST reported $31.5M of quarterly revenue (more than double Q1 2026) and a $230.9M GAAP net loss driven largely by a $125.9M loss on involuntary conversion tied to the BlueBird 7 de-orbit, while its contracted revenue backlog grew to about $1.3B and the company disclosed three additional U.S. government awards worth over $100M of near-term funded value across 2026-2027; full-year 2026 revenue guidance of $150M-$200M was reaffirmed. Executives said the company has 10 launches booked across two providers and is not relying on Blue Origin's New Glenn to reach its ~45-satellite early-2027 target. On August 11, 2026 AST told the FCC it would begin UK direct-to-cell operations with Vodafone 'imminently', and on August 14, 2026 the FCC granted it a 30-day special temporary authority to test Supplemental Coverage from Space service over 800 MHz spectrum on up to 100 devices. By late August 2026, BlueBird 12 and 13 had fully deployed their 2,400 sq ft phased arrays, and New Zealand carrier 2degrees officially opened its Marton satellite ground station, completing voice, video and mobile-data test sessions over standard smartphones; Berenberg initiated coverage on September 2, 2026 with a Buy rating and $92 price target as partners including US Mobile prepared to launch direct-to-cell coverage on the network.

Astroscale logo

Astroscale

Defense Tech

Astroscale is the only company in the world building a business purely around servicing what is already in orbit: removing debris, deorbiting dead satellites, extending the life of working ones, refueling them, and inspecting them. Founded in Tokyo in 2013 by Nobu Okada and listed on the Tokyo Stock Exchange Growth market since June 2024 under ticker 186A, it operates across Japan, the UK, the US, France, and Israel. Its ADRAS-J spacecraft made history in 2024 as the first vehicle ever to approach and photograph a large piece of orbital debris up close, a discarded Japanese rocket upper stage, and it completed operations and began its own deorbit in March 2026. JAXA has since contracted the follow-on ADRAS-J2 for roughly 12 billion yen to go back to that same rocket body and actually remove it with a robotic arm. Alongside that flagship line Astroscale is preparing ELSA-M, billed as the world's first commercial end-of-life deorbit service and now booked on Isar Aerospace's Spectrum rocket; LEXI, a geostationary life-extension servicer; the Astroscale U.S. Refueler, which is set to perform the first refueling of a United States Space Force asset; and ISSA-J1, a 2027 mission that will inspect two retired Japanese satellites in different orbits on a single flight. The company remains deeply loss-making: for the fiscal year ended April 30, 2026 it reported 5.94 billion yen of IFRS revenue against a 9.98 billion yen operating loss, with an order backlog of 37.94 billion yen. In June 2026 it closed a 30.6 billion yen strategic growth financing with Hulic and SKY Perfect JSAT to fund facility expansion and LEXI-P production.