Saronic

Marauder

Active

Saronic's 180-foot Medium Unmanned Surface Vessel: 12-knot cruise, 25-plus-knot sprint, up to 5,400 nautical miles at 25 MT base load and 4,100 nm at 150 MT max load, with 150 metric tons of modular payload (four 40-foot or eight 20-foot ISO containers). First hull was designed, built, and launched in under a year at Franklin, Louisiana. On Sept 29, 2026 the Navy awarded a production Other Transaction after Phase I at-sea testing.

Latest update Oct 7, 2026

Marauder

01

Current status

Navy production OTA awarded Sept 29, 2026 after successful Phase I at-sea testing. Navy: 10 MUSVs per awardee at a $40,000,000 average; Saronic did not disclose its individual firm-fixed-price or hull count to gCaptain. CEO Dino Mavrookas said the third Marauder hull has been flipped, with more in the Franklin line. Specs on the vessels page are unchanged. Production begins immediately at Franklin; first deliveries prior to the end of FY2027, USNI citing Miller as early as Q4 FY2027.

02

Specifications5

Length
180 ft
Speed
12 kt cruise / 25+ kt sprint
Range
5,400 nm at 25 MT base load

4,100 nm at 150 MT max load

Payload
150 metric tons, modular (4x40' or 8x20' ISO)
Gulfport Trial Hours
Over 300 hours as of mid-August 2026

CCO Rob Lehman

03

Upcoming milestones2

Announced next steps from Saronic that mention Marauder.

  1. H1 2027

    Scale Franklin and Austin output toward company production targets

    TargetEarly 2027 (Franklin expansion complete); 2027+ (full production ramp)

    Three more Marauder hulls are under construction at Franklin, Louisiana, where Saronic's $300 million shipyard expansion (construction started November 2025, topped out August 25, 2026) is designed to support up to 20 Marauders a year once complete, on track for early 2027. On a September 7, 2026 factory tour, CEO Dino Mavrookas walked a 420,000-square-foot Austin Corsair line that he described as having capacity for 2,000 boats a year - the same figure previously framed as a new-line target on top of a 400-500 Corsair rating. In July 2026 Saronic said it could eventually produce hundreds of Mirages and thousands of Corsairs a year. These are company projections, so demonstrated delivery rates are the thing to watch rather than stated capacity.

  2. Q3 2027

    Deliver first Marauder MUSVs to the Navy

04

In the news4

  1. Navy moves Saronic's Marauder into MUSV production

    On September 29, 2026 Saronic said it won a firm-fixed-price Navy production Other Transaction for its 180-foot Marauder autonomous surface vessel after an at-sea evaluation covering more than 140 scenarios over eight days. Trade reporting that quoted Navy officials said Saronic, Huntington Ingalls Industries and Galliano Marine Services each received agreements for 10 Medium Unmanned Surface Vessels at an average cost of about $40 million, with first deliveries targeted before the end of fiscal 2027. Saronic itself did not disclose award value or hull count to gCaptain, and a navy.mil production press release was not retrieved.

    gcaptain.com defence-industry.eu

  2. Saronic lays keel for production 150-foot Marauder hull

    Saronic held a keel-laying ceremony on August 22 for a 150-foot Marauder autonomous surface vessel at its Franklin, Louisiana shipyard, which trade outlets described as the start of series production for the class. The uncrewed vessel carries a 40-metric-ton payload and can travel up to 3,500 nautical miles or loiter for more than 30 days, and will be built alongside Saronic's larger 180-foot Marauder variant at the same shipyard, where the company is completing a $300 million, 3,200-job expansion.

    WorkBoat Ocean News & Technology

  3. Saronic tops out $300 million Louisiana shipyard expansion

    Saronic Technologies and builders JE Dunn Construction and Alberici Constructors placed the final structural beam on August 25 in a topping-out ceremony for the $300 million expansion of Saronic's Franklin, Louisiana shipyard. The expansion adds more than 300,000 square feet, including three new slips, added warehouse capacity and a dedicated production line for Saronic's 180-foot Marauder autonomous vessels, and is scheduled for completion in early 2027 after reaching a peak workforce of about 200 construction workers.

    WorkBoat Seapower Magazine

  4. Saronic opens Gulfport, Mississippi site for Marauder testing

    Saronic announced August 9 that it has taken a 30,000-plus-square-foot facility at the Port of Gulfport, Mississippi, dedicated to on-water testing and commissioning of its 180-foot Marauder unmanned surface vessel before delivery. The company's first Marauder arrived at the site in mid-July and has logged hundreds of hours of trials running 12-plus hours a day, with additional hulls built at its Franklin, Louisiana shipyard set to transfer there as production increases.

    Naval News SuperTalk Mississippi