Megablock

In Development
Tesla
Tesla
Megablock

Overview

Utility-scale integrated energy storage solution unveiled in September 2025. Combines up to 4 Megapack 3 units with a transformer and switchgear into a single 20 MWh AC system. Achieves 23% faster installation and up to 40% lower construction costs compared to traditional deployments. 248 MWh per acre density; can deploy 1 GWh in 20 business days. 25-year / 10,000-cycle life. To be manufactured at the Houston Megafactory.

Unveiled September 2025. Production at Houston Megafactory starting H2 2026. Deliveries expected H2 2026.

Key Specs

Capacity

20 MWh AC per Megablock

Round-Trip Efficiency

91%

Deployment Speed

1 GWh in 20 business days