What to Watch

No Date Yet

192 announced milestones without a dated target yet. Each links to the company's page, with the full description and source.

  1. No date yetComplete a long-duration Starship orbital flightSpaceX
  2. No date yetLaunch the first Rocket Lab-built GEO satellite for Space Systems CommandRocket Lab
  3. No date yetHand over the Viasat PTS-G satellite built on Rocket Lab's GEO busRocket Lab
  4. No date yetFinish Neutron Stage 1 hydrostatic testingRocket Lab
  5. No date yetLaunch the first operational Blue Ring missionBlue Origin
  6. No date yetWin FAA approval for up to 50 New Glenn launches a year at LC-36Blue Origin
  7. No date yetOpen the Constellation Park satellite factory in Hutto, TexasBlue Origin
  8. No date yetLand astronauts on the Moon with Blue Moon Mark 2Blue Origin
  9. No date yetResolve the ULA ownership question amid renewed sale talksUnited Launch Alliance
  10. No date yetCertify Vulcan for Starliner human spaceflightUnited Launch Alliance
  11. No date yetReturn Vulcan to flight after the Nov. 15 lossUnited Launch Alliance
  12. No date yetClear the Space Systems Command review and resume NSSL launchesUnited Launch Alliance
  13. No date yetObtain FAA vehicle operator license for Terran R at SLC-16Relativity Space
  14. No date yetHot-fire Terran R Stage 1Relativity Space
  15. No date yetLaunch Impulse Moon Base payloads on Terran RRelativity Space
  16. No date yetStart competing for NSSL task ordersStoke Space
  17. No date yetFly the next Zhuque-2-series mission after Y4LandSpace
  18. No date yetList on Shanghai STAR Market (IPO)Space Pioneer
  19. No date yetScale Gravity-1 launch cadenceOrienspace
  20. No date yetRefile C01-1735 in PJM Cycle 02 or the Expedited Interconnection TrackOklo
  21. No date yetExecute Kemmerer Unit 1 constructionTerraPower
  22. No date yetName the Kemmerer Unit 1 EPC contractorTerraPower
  23. No date yetNYPA names its Upstate nuclear development partnerTerraPower
  24. No date yetProduce first HALEU TRISO pebble for Hermes 1 and file an operating-license applicationKairos Power
  25. No date yetFinish TX-1 and begin licensed fuel manufacturingX-energy
  26. No date yetAdvance Xe-100 through UK Generic Design AssessmentX-energy
  27. No date yetReach a final investment decision on the Indiana Xe-100 studyX-energy
  28. No date yetNYPA names a host, technology, and development partnerX-energy
  29. No date yetPrice and list the HNUC IPOHoltec International
  30. No date yetGulf South SMR-300 evaluation with Entergy and Hyundai E&CHoltec International
  31. No date yetFinish remaining Palisades fuel loadingHoltec International
  32. No date yetFile a successor HNUC registration if Holtec returns to public marketsHoltec International
  33. No date yetNYPA names its Upstate nuclear development partnerHoltec International
  34. No date yetBegin Raceway Energy Campus constructionValar Atomics
  35. No date yetSign a definitive CHIPS award agreementHelion Energy
  36. No date yetDeploy the first commercial Stellaris plant at GundremmingenProxima Fusion
  37. No date yetFinalize $4.5B KC-46A tanker sale to QatarBoeing
  38. No date yetConvert the $13.4B tanker FMS ceiling into obligated ordersBoeing
  39. No date yetA320 Family production ramp toward 75/monthAirbus
  40. No date yetFirst flight and entry into service for the A350FAirbus
  41. No date yetRun integrated ZEROe ground testingAirbus
  42. No date yetDefine the next-generation single-aisle platformAirbus
  43. No date yetFinalize Spain-Poland A330 MRTT joint procurement contractAirbus
  44. No date yetDeliver first Superpower turbines after Crusoe exitBoom Supersonic
  45. No date yetC929 wide-body developmentCOMAC
  46. No date yetFly the C919 derivative familyCOMAC
  47. No date yetObtain a CAAC type certificate for the CE-25ACOMAC
  48. No date yetFly Quarterhorse Mk 2.2 beyond Mach 2Hermeus
  49. No date yetScale Index data collection and $1B data-compute spendFigure AI
  50. No date yetDeliver the first Tesla Semis under the ZET SCALE orderTesla
  51. No date yetSign a definitive merger agreement with SpaceXTesla
  52. No date yetSign the Texas JETI agreement for the Crystal Sun solar factoryTesla
  53. No date yetUnveil Optimus V3 publiclyTesla
  54. No date yetComplete the staggered Western commercial launch (Asia, North America)Unitree Robotics
  55. No date yetReceive remaining Volkswagen Group equity of USD 460 millionRivian
  56. No date yetRamp the Szeged, Hungary plant to full-scale productionBYD
  57. No date yetName Fang Cheng Bao Shark China on-sale date and priceBYD
  58. No date yetPath to profitability and free cash flowLucid Motors
  59. No date yetDeliver NIO's first full year of positive operating profitNIO
  60. No date yetClose Geely 30% NIO Power transactionNIO
  61. No date yetDisclose NIO China cash for 10% of Zhejiang Haohan Energy and which charging assets Haohan will buyNIO
  62. No date yetBegin external supply of the Mach M100Li Auto
  63. No date yetFirst UAE customer deliveries of the Zeekr 9XZeekr
  64. No date yetOpen fully driverless public service in PittsburghWaymo
  65. No date yetOpen Nashville airport rides to all Waymo ridersWaymo
  66. No date yetOpen Las Vegas service to all riders without a waitlistWaymo
  67. No date yetResume driverless freeway operations in CaliforniaWaymo
  68. No date yetResume Bay Area commercial ride-hailing after the Nov. 23 pauseWaymo
  69. No date yetPositive free cash flow on a run-rate basisAurora Innovation
  70. No date yetShip the first 10 Gen-7 robotaxis to South KoreaPony.ai
  71. No date yetOpen fully driverless paid robotaxi rides in DohaPony.ai
  72. No date yetOpen fully driverless paid robotaxi service in ZagrebPony.ai
  73. No date yetOpen robotaxi rides to riders in PhoenixZoox
  74. No date yetOpen robotaxi rides to riders in DallasZoox
  75. No date yetOpen robotaxi rides to riders in HoustonZoox
  76. No date yetOpen robotaxi rides to riders in San DiegoZoox
  77. No date yetOpen the Atlanta robotaxi public waitlistZoox
  78. No date yetFinalize expanded EXIM Bank financing to double manufacturing capacityBeta Technologies
  79. No date yetComplete the Jefferies review of strategic alternativesVertical Aerospace
  80. No date yetLaunch public ticketed pilotless passenger flights in Guangzhou and HefeiEHang
  81. No date yetClear FAA environmental review for five Texas metrosZipline
  82. No date yetExpand Zipline-app delivery beyond the Round Rock three-mile zoneZipline
  83. No date yetKirkwood City Council drone-nest hearing and FAA Part 108 OIRA decisionWing
  84. No date yetDeploy Starlink V3 satellites at scale via StarshipStarlink
  85. No date yetComplete Flight 14 V3 checkout and begin serving customersStarlink
  86. No date yetOpen the AT&T Business managed Leo offerAmazon Leo
  87. No date yetLaunch first 32 OneWeb refresh satellites on SpaceXEutelsat OneWeb
  88. No date yetBegin UK direct-to-cell operations with VodafoneAST SpaceMobile
  89. No date yetScale Japan D2C service to nationwide coverageAST SpaceMobile
  90. No date yetEvaluate vertical integration into launch capacityAST SpaceMobile
  91. No date yetClose Ligado L-band spectrum transaction pending FCC approvalAST SpaceMobile
  92. No date yetLaunch BlueBird 14, 15 and 16AST SpaceMobile
  93. No date yetReach beta service when BlueBird 28 is in orbitAST SpaceMobile
  94. No date yetComplete the 1,296-satellite Phase 1 networkQianfan (Spacesail)
  95. No date yetResubmit mCOMBRIAX (mRNA-1083) US applicationModerna
  96. No date yetEngage health authorities on the norovirus vaccineModerna
  97. No date yetDefer the mRNA-3705 pivotal startModerna
  98. No date yetAdditional 2026-2027 late-stage cancer readoutsBioNTech
  99. No date yetShareholders elect KPMG as independent auditor for FY2027BioNTech
  100. No date yetClose remaining COVID manufacturing sites after failed saleBioNTech
  101. No date yetAHEAD-MERIT overall-survival readout for BNT113BioNTech
  102. No date yetChoose a next step for trastuzumab pamirtecan in HR-positive HER2-low breast cancerBioNTech
  103. No date yetReady the Melbourne mRNA facility for GMP manufacturingBioNTech
  104. No date yetClose Scholar Rock FDA Priority Review Voucher purchaseBioNTech
  105. No date yetRun the new misalignment disclosure framework to its own deadlinesOpenAI
  106. No date yetGive independent evaluators employee-like accessOpenAI
  107. No date yetEnd Cursor's direct access to OpenAI modelsOpenAI
  108. No date yetResume most-capable-model training after DNS-control validationOpenAI
  109. No date yetStand up an in-house chip design teamAnthropic
  110. No date yetExtend the model lineup and agentic productsAnthropic
  111. No date yetResolve the Pentagon standoff and lead on AI safety/policyAnthropic
  112. No date yetDefend against the Sony Music Publishing and Warner Chappell copyright suitAnthropic
  113. No date yetOpen AlphaGenome Atlas to commercial Google Cloud usersGoogle DeepMind
  114. No date yetPublish Suncatcher in-orbit Trillium TPU healthGoogle DeepMind
  115. No date yetShip the rest of the Gemini 4 familyGoogle DeepMind
  116. No date yetExpand Firefox Smart Window from the US, Canada and France into the UK and GermanyMistral AI
  117. No date yetConvert the ESA letter of intent into a production space-AI contractMistral AI
  118. No date yetOpen the 10 MW Les Ulis inference data centerMistral AI
  119. No date yetLaunch DeepSeek-V4.1-ProDeepSeek
  120. No date yetLaunch DeepSeek-V4.1-Pro and close the 50 billion yuan follow-on roundDeepSeek
  121. No date yetShip GLM-6.0, the named Full Self-Training flagshipZhipu AI (Z.ai)
  122. No date yetExpand sovereign-AI deals internationallyZhipu AI (Z.ai)
  123. No date yetShip GLM-6.0 Full Self-Training flagshipZhipu AI (Z.ai)
  124. No date yetOpen the GLM-5.4 pay-per-token APIZhipu AI (Z.ai)
  125. No date yetRelease the GLM-5.4 weightsZhipu AI (Z.ai)
  126. No date yetSign the Kuwait counter-drone FMS contractAnduril Industries
  127. No date yetJoin Track 1 of the DHS counter-UAS IDIQAnduril Industries
  128. No date yetField the NGC2 data layer to I CorpsAnduril Industries
  129. No date yetStart ALTIUS 600 production at Arsenal-1Anduril Industries
  130. No date yetDefend government/defense AI turf against Google's Fairwind pushPalantir Technologies
  131. No date yetCongress to fund $2.3B FY2027 Maven / Joint Fires Network expansionPalantir Technologies
  132. No date yetJapan evaluates Maven Smart System for Self-Defense Force command and controlPalantir Technologies
  133. No date yetBring Nebius compute inside the Palantir perimeterPalantir Technologies
  134. No date yetSecure irrevocable zero-data-retention from Anthropic before hosting its modelsPalantir Technologies
  135. No date yetInitial Clarity version for Germany's Lithuania brigadeHelsing
  136. No date yetDeliver X-BAT under the Navy's RIMES prototype awardShield AI
  137. No date yetScale Hivemind's orbital autonomy demonstrations toward a real constellationShield AI
  138. No date yetStart X-BAT prototype engine runs, then crane and untethered testsShield AI
  139. No date yetConvert the Fujitsu Japan MOU into a binding support frameworkGeneral Atomics Aeronautical Systems
  140. No date yetFree-flying Axiom Station (Hab-1 joins PPTM)Axiom Space
  141. No date yetOn-orbit ARC post-quantum cryptography demonstrationAxiom Space
  142. No date yetDeliver an AxEMU for launch to the ISSAxiom Space
  143. No date yetCompete for NASA Moon Base work through the Lunar Programs divisionVast
  144. No date yetShip Haven-1 to NASA ArmstrongVast
  145. No date yetMeet near-doubled chipmaking-tool demand across ~20 simultaneous fab buildsTSMC
  146. No date yetDecide on a Texas site or a TSMC-run TerafabTSMC
  147. No date yetResolve the US Commerce Department's EUV-to-China shipment inquiry - as the Dutch government's own new DUV servicing curbs take effectASML
  148. No date yetNikon and Canon test ASML's edges: an ArF price war and a nanoimprint memory pushASML
  149. No date yetDouble chip unit shipments over the next yearNvidia
  150. No date yetAdvance the Ya'an lithium-salt plant past first EIA disclosureCATL
  151. No date yetPilot DHL Green Freight Corridors in EuropeCATL
  152. No date yetDisclose site and start date for the Egypt BME plantCATL
  153. No date yetMove Debrecen from trial cells to series productionCATL
  154. No date yetStart mass production of the aviation battery systemCATL
  155. No date yetReconcile EIA December 2027 planned operation for Cambridge BA1 with company CODForm Energy
  156. No date yetTake first Elevra NAL spodumene shipmentsLG Energy Solution
  157. No date yetConvert NSSL Lane 1 prime status into mission task ordersImpulse Space
  158. No date yetReport LEO Express 4 on-orbit checkout resultsImpulse Space
  159. No date yetFly two NASA Moon Base VADR task ordersImpulse Space
  160. No date yetLaunch the Space Force space-domain-awareness MiraImpulse Space
  161. No date yetLaunch ELSA-M and prove commercial end-of-life deorbitingAstroscale
  162. No date yetReach the FY2027 revenue guidance and rebuild backlogAstroscale
  163. No date yetQualify the Space Inventor LEO servicing interface for a customer-bus demoAstroscale
  164. No date yetFly Project LEDAAstroscale
  165. No date yetConvert H1 run-rate into a full-year industrial printUBTECH Robotics
  166. No date yetDeliver UWORLD U1 household unitsUBTECH Robotics
  167. No date yetFinish commissioning the four Bandwagon-5 SAR satellitesICEYE
  168. No date yetOpen the Greek satellite assembly plantICEYE
  169. No date yetCONSOB approval of the Avio offer documentICEYE
  170. No date yetSanofi to start human studies of HXN-1002 and HXN-1003Earendil Labs
  171. No date yetClose Genentech collaboration and name oncology target combinationsEarendil Labs
  172. No date yetDeliver Q4 FY2026 AI semiconductor revenue of $21.7 billionBroadcom
  173. No date yetPrint about $115 billion of AI semiconductor revenue in FY2027Broadcom
  174. No date yetStart deploying the Singapore fab for XPU substratesBroadcom
  175. No date yetStart AST Singapore high-volume FC-BGA substrate production for Broadcom XPUsBroadcom
  176. No date yetAdvance CS-6 3D-stacked DRAMCerebras Systems
  177. No date yetName a CS-4 Nexus customer shipment after Q3 2026 closesCerebras Systems
  178. No date yetDecide Solidigm capital plan, including any listingSK hynix
  179. No date yetLaunch Qwen-Image 3.1Qwen
  180. No date yetPublish Qwen 4.5 or Qwen 5 at 5 to 10 trillion parametersQwen
  181. No date yetPublish a priced Hong Kong listing documentAgiBot
  182. No date yetPublish 2026 shipment mix or a post-H1 unit totalAgiBot
  183. No date yetIntroduce additional macOS Full Disk Access controlsApple Inc.
  184. No date yetIDC worldwide Q3 2026 smartphone table after the Q2 2026 printvivo
  185. No date yetClose the Huawei patent license and U.S. patent purchaseQualcomm
  186. No date yetClose the PickNik acquisitionQualcomm
  187. No date yetEurope on-sale date for vivo X500 Pro and X500 Pro MaxMediaTek
  188. No date yetFinish the closed-freeway-lane recall remedyAlphabet
  189. No date yetConnect Drive and the Gemini app to Search Personal IntelligenceAlphabet
  190. No date yetResume Bay Area ride-hailing after the Nov. 23 pauseAlphabet
  191. No date yetReturn Vulcan to flight after the Leo 1 anomalyAmazon
  192. No date yetBoard sets the Class C dividend record dateMeta

/ Other years